Cleaning & Painting Existing Steel Piling Section Totals: $759,035.00 $817,285.80 $877,877.50
One winning unit price
Single 1 winning bid$3,848/ EA
- Letting
- Sep 9, 2025
- Quantity
- 8 EA
- Agency
- SCDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- SCDOT · South Carolina
- Letting
- Sep 9, 2025
- Quantity
- 8 EA
- Contractor
- Lorr Construction, Inc.
- Winning price
- $3,848 / EA
What’s behind $3,848
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per EA, ranked by how much evidence each has.
- Pile DRV Equip Setup ** Steel Piles$1,134462 bids
- Post Hole Through Conc for Steel Post$78.75456 bids
- Downstream Anchor Terminal Section$1,478385 bids
- Posts Tubular Steel 2x2-Inch x 14$190377 bids
- Steel Pile Points$195284 bids
- Remove Terminal Anchor Section$230275 bids
- Posts Tubular Steel 2x2-Inch x$125249 bids
- Beam Guardrail Transition Section Type 21$3,450226 bids
1 observation
1 agency in 1 state · lettings Sep 9, 2025
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.