Bridge Repair, Removal of Grease and Grout from the Ends of Cable Strands
One winning unit price
Single 1 winning bid$600/ EA
- Letting
- Mar 30, 2001
- Quantity
- 192 EACH
- Agency
- ALDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Mar 30, 2001
- Quantity
- 192 EACH
- Contractor
- Alabama Bridge Builders, Inc.
- Winning price
- $600 / EA
What’s behind $600
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other street lighting items priced per EA, ranked by how much evidence each has.
- Cable Barrier Terminal (Removal)$27.7550 bids
- Retensioning Cable Barrier Section After Repair$50.0041 bids
- Alt.Breakaway Cable Term.(GR‐9)$2,500849 bids
- Alternate Breakaway Cable Terminal (GR-9)$2,450699 bids
- Cable Pole, TS, Disman$150289 bids
- Wood Pole, Fit up, TS Cable Pole$590265 bids
- Cable Pole, TS and Sec, Disman$150183 bids
- Guardrail, Mgs, W-beam, Cable Terminal Anchor$1,300167 bids
1 observation
1 agency in 1 state · lettings Mar 30, 2001
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.