Bridge Railing, Aesthetic Parapet Tube, Modified, South
One winning unit price
Single 1 winning bid$150/ LF
One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
- Letting
- Jul 7, 2017
- Quantity
- 93 Ft
- Agency
- MDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
1Winning bid
1Agency
Jul 7, 2017Letting period
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Jul 7, 2017
- Quantity
- 93 Ft
- Contractor
- Grand River Construction, Inc.
- Winning price
- $150 / LF
What’s behind $150
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Create free accountHave one? Sign in
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per LF, ranked by how much evidence each has.
- Bridge Railing, Aesthetic Parapet Tube$212124 bids
- Bridge Railing, 2 Tube$150151 bids
- Concrete Bridge Barrier Parapet$70.00303 bids
- Bridge Railing, Thrie Beam Retrofit$52.00106 bids
- 42" Mash Concrete Barrier Parapet/Railing Wall$140105 bids
- Salvage Metal Bridge Railing$20.0086 bids
- Bridge Railing, Remove$22.0085 bids
- Curb and Gutter, Bridge Approach, Modified$45.0071 bids
1 observation
1 agency in 1 state · lettings Jul 7, 2017
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
1 rows, each with its source document. Sign in to open them.Create free account