Skip to content
Structures722-12463

Bridge Deck, Remove Existing Concrete Overlay, Bridge No. 3

Unit SYLettings Dec 9, 2020 – May 15, 20241 agency in 1 state

Median winning unit price

Moderate 5 winning bids

≈$10.00/ SYLow confidence

Treat this as a rough guide. Only 5 winning bids on record — we want 12 or more before calling a figure a median.
Winning bids
5
Source documents
3

Winning bids only, as awarded. Nominal dollars. How we compute this

5Winning bids
1Agency
Dec 9, 2020 – May 15, 2024Letting period

Where the number comes from

One of the 5 winning bids behind that median, with the agency’s own document one click away.

Agency
INDOT · Laporte, Porter, Indiana
Letting
May 15, 2024
Quantity
202 SY
Contractor
Laporte Construction Company INC
Winning price
$18.13 / SY
Open bid tabMay 15, 2024 letting · 2024-05-15-Bid-Tabs-updated-5.22.pdf

What’s behind $10.00

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 5 bids charted, so you can see clusters and outliers.

  • 5 observations

    Agency, county, letting date, quantity and the price as printed.

  • 3 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

Who let the work, and how agencies and states compare

Estimator

The median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.

See what Estimator adds

5 observations

1 agency in 1 state · lettings Dec 9, 2020 – May 15, 2024

LettingAgency · CountyQuantityUnit priceSource document
5 rows, each with its source document. Sign in to open them.Create free account

Something wrong with this price? Report it — the form arrives knowing which item you mean.