Bridge Concrete Superstructure, Sta. 18+05.00, Approx. 964 CU.
Median lump-sum amount
Thin 3 winning bids≈$393,000per contractLow confidence
- Winning bids
- 3
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 3 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Mar 29, 2002
- Quantity
- 1 LS
- Contractor
- THE Morris Group, Inc.
- Winning price
- $349,279 / LS
What’s behind $393,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 3 bids charted, so you can see clusters and outliers.
3 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per LS, ranked by how much evidence each has.
- Surface Seal, Bridge No. 05$5,32257 bids
- Removal of Old Bridge, Station 10+00.00$40,00019 bids
- Jacking and Supporting, Superstructure, Bridge No. 2$22,00018 bids
- Jacking and Supporting, Superstructure, Bridge No. 1$28,50017 bids
- Epoxy Injection, Furnishing Equipment, Bridge No. 05$88816 bids
- Removal of Old Bridge, Station 15+00.00$6,50015 bids
- Repairs to Existing Bridge, Station 100+00.00$60,00015 bids
- Paint Steel Bridge, Bridge No. 05$36,00013 bids
3 observations
1 agency in 1 state · lettings Mar 29, 2002
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.