Box Beam Surface Grouting
Median winning unit price
Moderate 6 winning bids≈$15.00/ SFLow confidence
- Winning bids
- 6
- Source documents
- 6
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 6 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Jul 24, 2026
- Quantity
- 100 Sft
- Contractor
- Lakeland Asphalt Corporation
- Winning price
- $6.00 / SF
Median by quarter
EstimatorHow this item has priced over time, quarter by quarter, from the same rows as the headline figure.
See what Estimator addsWhat’s behind $15.00
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 6 bids charted, so you can see clusters and outliers.
6 observations
Agency, county, letting date, quantity and the price as printed.
6 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other other items priced per SF, ranked by how much evidence each has.
- Temporary Pedestrian Surface$6.00882 bids
- Temporary Pedestrian Surface Plate$7.84286 bids
- Repair Spalled Surface Area$500191 bids
- Temporary Pedestrian Surface P$5.0037 bids
- Temporary Pedestrian Surface a$5.3736 bids
- Pour-in-place Permeable Surface$50.004 bids
- Surface Patching$2003 bids
- Utility Service Surface Restoration$0.693 bids
6 observations
1 agency in 1 state · lettings Dec 4, 2015 – Jul 24, 2026
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.