Water740M001

Ballast for Cone Trainee Hours at 80 Cents per Hour Steel Reinforcement Steel Test Piles (HP 12x53) Static Loading Tests (HP 12x53) Dynamic Loading Tests (HP 12x53) Steel Piling Furnished and Driven (HP 12x53) Drilled Shaft Excavation, 3'-6" Diamete Alabama Department of Transportation Date: 11/05/10 Page: 009 -28 Tabulation of Bids Call Order: 009 Contract ID: 20101105009 Counties: Marengo Letting Date: 11/05/10 10:00 AM Division: 08 Line NO / Item Code / ALT Item Description Quantity Drilled Shaft Construction, 3'-6" Diameter, Class DS1 Concrete Permanent Drilled Shaft Casing, 3'-6" Diameter Crosshole Sonic Logging, 3'-6" Diameter Bridge Substructure Concrete, Class A Unclassified Bridge Excavation Cofferdams or Sheeting and Shoring, Station 145+75.00 Cofferdams or Sheeting and Shoring, Station 154+63.00 Steel Reinforcement Steel Test Piles (HP 12x53) Static Loading Tests (HP 12x53) Dynamic Loading Tests (HP 12x53) Alabama Department of Transportation Date: 11/05/10 Page: 009 -29 Tabulation of Bids Call Order: 009 Contract ID: 20101105009 Counties: Marengo Letting Date: 11/05/10 10:00 AM Division: 08 Line NO / Item Code / ALT Item Description Quantity Steel Piling Furnished and Driven (HP 12x53) Bridge Substructure Concrete, Class A Contract Totals Alabama Department of Transportation Date: 11/05/10 Page: 009 -30 Tabulation of Bids Call Order: 009 Contract ID: 20101105009 Counties: Marengo Letting Date: 11/05/10 10:00 AM Division: 08 Line NO / Item Code / ALT Item Description Quantity

Unit EALettings Nov 5, 20101 agency in 1 state

One winning unit price

Single 1 winning bid

$5.00/ EA

One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
Letting
Nov 5, 2010
Quantity
50 EACH
Agency
ALDOT

Winning bids only, as awarded. Nominal dollars. How we compute this

1Winning bid
1Agency
Nov 5, 2010Letting period

Where the number comes from

One of the 1 winning bids behind that median, with the agency’s own document one click away.

Agency
ALDOT · Alabama
Letting
Nov 5, 2010
Quantity
50 EACH
Contractor
Newell & Bush, Inc.
Winning price
$5.00 / EA
Open bid tabcontract 20101105009 · lnov0510.pdf

What’s behind $5.00

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 1 bids charted, so you can see clusters and outliers.

  • 1 observations

    Agency, county, letting date, quantity and the price as printed.

  • 1 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

1 observation

1 agency in 1 state · lettings Nov 5, 2010

LettingAgency · CountyQuantityUnit priceSource document
1 rows, each with its source document. Sign in to open them.Create free account

Something wrong with this price? Report it — the form arrives knowing which item you mean.