609.6 Millimeter Encasement Pipe, Type 2 Installation Topsoil Topsoil from Stockpiles
Median winning unit price
Thin 3 winning bids≈$410/ MLow confidence
- Winning bids
- 3
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 3 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Jun 30, 2000
- Quantity
- 145 M
- Contractor
- Hastings General Contracting, Inc.
- Winning price
- $18.00 / M
What’s behind $410
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 3 bids charted, so you can see clusters and outliers.
3 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other water items priced per M, ranked by how much evidence each has.
- 508 Millimeter Encasement Pipe, Type 1 Installation Topsoil Topsoil from Stockpiles$3854 bids
- 304.8 Millimeter Encasement Pipe, Type 1 Installation Topsoil from Stockpiles$1513 bids
- 609.6 Millimeter Encasement Pipe, Type 2 Installation Topsoil$6736 bids
- 609.6 Millimeter Encasement Pipe, Type 1 Installation$2946 bids
- 609.6 Millimeter Encasement Pipe, Type 2 Installation$6853 bids
- 304.8 Millimeter Encasement Pipe, Type 1 Installation$30810 bids
- 406.4 Millimeter Encasement Pipe, Type 1 Installation$3507 bids
- 406.4 Millimeter Encasement Pipe, Type 2 Installation$4097 bids
3 observations
1 agency in 1 state · lettings Jun 30, 2000
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.