4" Reinforced Concrete Slab over Utility Line Section Totals: $5,592,320.00 $5,619,306.43 $5,866,558.56
Median winning unit price
Very thin 2 winning bids≈$400/ SYLow confidence
- Winning bids
- 2
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 2 winning bids behind that median, with the agency’s own document one click away.
- Agency
- SCDOT · South Carolina
- Letting
- Dec 11, 2018
- Quantity
- 7 SY
- Contractor
- GLF Construction Corporation
- Winning price
- $400 / SY
What’s behind $400
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 2 bids charted, so you can see clusters and outliers.
2 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other paving items priced per SY, ranked by how much evidence each has.
- Removal of Concrete Pavement Slab$70.0085 bids
- Jointed Reinforced Concrete Pavement 12 in.$15278 bids
- Removing Concrete Sidewalk$10.002,276 bids
- Cold Plane Asphalt Concrete Pavement$6.202,056 bids
- Miscellaneous Cold Milling of Bituminous Concrete$11.001,407 bids
- Removing Concrete Pavement$8.891,357 bids
- Removing Concrete Driveway$20.001,154 bids
- Concrete Sidewalk(4" Uniform)$58.171,072 bids
2 observations
1 agency in 1 state · lettings Dec 11, 2018
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|