4" Electrical Conduit, 1 Line, Type 1 Installation Trainee Hours at 80 Cents per Hour Contract Totals
Median winning unit price
Very thin 2 winning bids≈$29.25/ LFLow confidence
- Winning bids
- 2
- Source documents
- 2
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 2 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Jul 25, 2003
- Quantity
- 1933 LF
- Contractor
- Hastings General Contracting, Inc.
- Winning price
- $13.50 / LF
What’s behind $29.25
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 2 bids charted, so you can see clusters and outliers.
2 observations
Agency, county, letting date, quantity and the price as printed.
2 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other street lighting items priced per LF, ranked by how much evidence each has.
- 4" Electrical Conduit, 1 Line, Type 5 Installation$40.0085 bids
- 6" Electrical Conduit, 1 Line, Type 5 Installation$63.3477 bids
- Furnish & Install 1.0" Schedule 80 PVC Conduit$10.001,353 bids
- Furnish & Install 2.0" Schedule 80 PVC Conduit$10.001,000 bids
- Furnish & Install 3.0" Schedule 80 PVC Conduit$15.50351 bids
- Conduit, Hdpe, 2 in. Schedule 80$22.00246 bids
- Furnish & Install 2" Schedule 80 Hdpe Conduit (Directional Bored)$25.00214 bids
- Electrical Conductors-in-conduit (1C/8 a.W.G., Egc)$1.13165 bids
2 observations
1 agency in 1 state · lettings Jun 28, 2002 – Jul 25, 2003
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.