25.4 Millimeter Service Tap Concrete for Water Mains (Thrust Blocks)
Median winning unit price
Thin 3 winning bids≈$352/ EALow confidence
- Winning bids
- 3
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 3 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Jun 30, 2000
- Quantity
- 7 EACH
- Contractor
- John G. Walton Construction Company, Inc.
- Winning price
- $352 / EA
What’s behind $352
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 3 bids charted, so you can see clusters and outliers.
3 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other water items priced per EA, ranked by how much evidence each has.
- Tap for Water Service Including Corporation Stop, 1 Inch$35019 bids
- 1" Water Service$1,690109 bids
- 2" Water Service$5,08892 bids
- 3/4IN Water Service Meter Assembly$1,14546 bids
- Connect to Existing Water Service$92846 bids
- 1 1/ 2" Water Service$2,85026 bids
- 2IN Water Service Meter Assembly$4,28222 bids
- Reconnect Water Service$56220 bids
3 observations
1 agency in 1 state · lettings Jun 30, 2000
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.