24" Perf.Corr. Alum. Alloy PIPE-0.060"with Fabric
Median winning unit price
Thin 4 winning bids≈$150/ LFLow confidence
- Winning bids
- 4
- Source documents
- 3
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 4 winning bids behind that median, with the agency’s own document one click away.
- Agency
- SCDOT · South Carolina
- Letting
- May 8, 2018
- Quantity
- 1013 LF
- Contractor
- J. R. Wilson Construction Co., Inc.
- Winning price
- $150 / LF
What’s behind $150
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 4 bids charted, so you can see clusters and outliers.
4 observations
Agency, county, letting date, quantity and the price as printed.
3 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other other items priced per LF, ranked by how much evidence each has.
- 24" Roadway Pipe (Class 3 R.C.)$43.50905 bids
- 6" Perf Subdrn Pipe$12.00824 bids
- 24" Smooth Wall Pipe$100667 bids
- 24" Pipe$50.00464 bids
- 24" Roadway Pipe (Class 3 R.C.) (Extension)$65.00403 bids
- Pipe, Type 2, Circular, 24 in.$90.14283 bids
- 24" White Solid Lines (Stop/Diag Lines)-THERMO.-125 MIL$9.003,032 bids
- 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint$2.002,697 bids
4 observations
1 agency in 1 state · lettings Feb 10, 2015 – May 8, 2018
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.