15" Temporary Pipe Alabama Department of Transportation Date: 12/18/00 Page: 030 -7 Tabulation of Bids Call Order: 030 Contract ID: 20001208030 Counties: Baldwin Letting Date: 12/08/00 10:00 AM District: 09 Set-aside: Line NO / Item Code / ALT Item Description Quantity
One winning unit price
Single 1 winning bid$18.00/ LF
- Letting
- Dec 8, 2000
- Quantity
- 100 LF
- Agency
- ALDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Dec 8, 2000
- Quantity
- 100 LF
- Contractor
- T.l. Wallace Construction, Inc.
- Winning price
- $18.00 / LF
What’s behind $18.00
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other other items priced per LF, ranked by how much evidence each has.
- 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint$0.112,991 bids
- 18" Smooth Wall Pipe$83.701,153 bids
- 18" Roadway Pipe (Class 3 R.C.)$38.00949 bids
- 15" Pipe$37.00825 bids
- 18" Pipe$38.28668 bids
- Temporary Berm (Set Price)$2.00656 bids
- 1" Plastic Pipe (Schedule 40) (Supply Line)$6.07648 bids
- Pipe, Type 2, Circular, 12 in.$63.00580 bids
1 observation
1 agency in 1 state · lettings Dec 8, 2000
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.