| Signs (Construction) | square foot | $8.00 | $7.25 – $9.21 | 696 |
| Flexible Drums (Channelizing) | each | $34.73 | $25.19 – $41.00 | 592 |
| Plastic Pavement Marking (Stop Line) | linear foot | $18.00 | $12.75 – $25.00 | 566 |
| Removal of Snowplowable Reflective Marker | each | $11.15 | $9.50 – $15.01 | 468 |
| Snowplowable Raised Pavement Markers (Bi-dir) (1 Color) | each | $41.05 | $36.00 – $48.00 | 466 |
| Cold Planing Bituminous Pavement | ton | $31.61 | $23.39 – $49.83 | 450 |
| Bituminous Material for Tack Coat (Tc) | ton | $979.00 | $842.50 – $1,200 | 426 |
| Mineral Aggregate, Type A Base, Grading D | ton | $46.00 | $34.50 – $62.00 | 401 |
| Arrow Board (Type C) | each | $1,167 | $950.00 – $1,500 | 396 |
| Plastic Pavement Marking(Channelization Striping) | square yard | $30.00 | $24.15 – $35.00 | 391 |
| Plastic Pavement Marking (Turn Lane Arrow) | each | $210.00 | $185.00 – $250.00 | 384 |
| Changeable Message Sign Unit | each | $5,950 | $4,922 – $7,770 | 359 |
| Warning Lights (type A) | each | $22.00 | $6.37 – $30.00 | 281 |
| Snowplowable Raised Pavment Markers (MONO-DIR)(1 Color) | each | $41.00 | $35.00 – $47.62 | 279 |
| Guardrail Removed | linear foot | $3.00 | $1.15 – $5.00 | 276 |
| ACS MIX(PG64-22) Grading D | ton | $165.50 | $129.62 – $240.00 | 266 |
| Snowplowable Raised Pavement Markers (BI-DIR)(2 Color) | each | $40.00 | $35.16 – $45.00 | 254 |
| Tangent Energy Absorbing Term Mash TL-3 | each | $3,570 | $3,400 – $3,900 | 249 |
| Asphalt Concrete MIX (PG64-22) (Bpmb-hm) Grading B-M2 | ton | $157.50 | $118.00 – $226.50 | 241 |
| Trackless Tack Coat | ton | $925.00 | $780.00 – $1,050 | 205 |
| Guardrail Transition 27IN to 31IN | each | $156.50 | $105.50 – $200.00 | 201 |
| ACS MIX(PG70-22) Grading D | ton | $148.18 | $129.13 – $175.00 | 196 |
| Enhanced Flatline Thermo Pvmt Mrkng (6IN Dotted Line) | linear foot | $2.10 | $1.77 – $3.00 | 191 |
| Plastic Pavement Marking (Yield Line) | square foot | $30.00 | $17.50 – $36.75 | 185 |
| Temporary Barricades (Type Iii) | linear foot | $20.00 | $15.42 – $25.00 | 183 |
| Plastic Pavement Marking (8" Dotted Line) | linear foot | $3.16 | $2.40 – $4.00 | 181 |
| Sediment Removal | cubic yard | $33.30 | $20.00 – $60.00 | 172 |
| Road & Drainage Excavation (Unclassified) | cubic yard | $32.25 | $20.00 – $55.56 | 170 |
| Loop Wire | linear foot | $1.10 | $1.00 – $1.50 | 168 |
| Saw Slot | linear foot | $6.00 | $5.00 – $7.00 | 168 |
| Plastic Pavement Marking (Longitudinal Cross-walk) | linear foot | $35.00 | $26.50 – $45.00 | 163 |
| W Beam GR (Type 2) Mash TL-3 | linear foot | $32.83 | $30.00 – $37.50 | 162 |
| Geotextile (Type Iii)(Erosion Control) | square yard | $5.00 | $3.26 – $7.00 | 161 |
| Temporary Silt Fence (With Backing) | linear foot | $6.00 | $5.25 – $7.97 | 154 |
| Flat Sheet Aluminum Signs (0.080" Thick) | square foot | $15.10 | $13.25 – $17.35 | 153 |
| Temporary Work Zone Crash Cushion (Mash TL-3) | each | $8,462 | $6,750 – $10,500 | 153 |
| Mineral Aggregate (Size 57) | ton | $64.00 | $51.49 – $83.50 | 153 |
| Bituminous Material for Prime Coat (Pc) | ton | $1,160 | $800.00 – $1,580 | 149 |
| Perforated/Knockout Square Tube Post | pound | $5.06 | $4.24 – $6.00 | 144 |
| Flat Sheet Aluminum Signs (0.100" Thick) | square foot | $16.20 | $14.50 – $18.00 | 141 |
| Removal of Asphalt Pavement | square yard | $20.00 | $12.50 – $40.48 | 115 |
| Epoxy Coated Reinforcing Steel | pound | $1.90 | $1.65 – $2.40 | 69 |
| Mowing | acre | $74.00 | $64.00 – $82.00 | 43 |
| Sawing Concrete Pavement (Full Depth) | linear foot | $20.00 | $14.00 – $20.50 | 37 |