| Mobilization | ls | 4,947 | — | $21,987 | $1.00 – $13,500,001 | Oct 2, 2026, contract CN261076 ↗ |
| Traffic Control | ls | 4,623 | — | $16,500 | $1.00 – $2,840,000 | Oct 2, 2026, contract CN261076 ↗ |
| Sign (construction) | square foot | 3,996 | $7.50 | $7.00 | $0.92 – $100.00 | Oct 2, 2026, contract CN261076 ↗ |
| Plastic Pavement Marking (Stop Line) | linear foot | 3,258 | $13.00 | $15.05 | $5.00 – $200.00 | Oct 2, 2026, contract CN261076 ↗ |
| Flexible Drums (Channelizing) | each | 3,015 | $30.00 | $28.00 | $0.51 – $150.00 | Oct 2, 2026, contract CN261076 ↗ |
| Asphalt material for tack coat (tc) | ton | 2,969 | $710.00 | $940.00 | $1.00 – $6,930 | Oct 2, 2026, contract CN261076 ↗ |
| Arrow Board (Type C) | each | 2,237 | $949.00 | $825.00 | $1.00 – $6,361 | Oct 2, 2026, contract CN261076 ↗ |
| Enhanced flatline thermoplastic pavement mrkng (6in line) | l.m. | 2,213 | $6,200 | $20,080 | $3.50 – $225,000 | Oct 2, 2026, contract CN261076 ↗ |
| Mineral Aggregate, Type A Base, Grading D | ton | 1,910 | $31.54 | $54.00 | $5.00 – $1,100 | Oct 2, 2026, contract CN261076 ↗ |
| Paint pavement marking (4 inch line) | l.m. | 1,876 | $824.50 | $3,015 | $0.12 – $105,000 | Oct 2, 2026, contract CN261076 ↗ |
| Warning Lights (type A) | each | 1,829 | — | $20.00 | $1.00 – $120.00 | Oct 2, 2026, contract CN263064 ↗ |
| Plastic Pavement Marking (Turn Lane Arrow) | each | 1,773 | $175.00 | $251.00 | $1.80 – $600.00 | Oct 2, 2026, contract CN261076 ↗ |
| Plastic pavement marking(channelization stripe) | square yard | 1,713 | $22.00 | $25.00 | $1.00 – $250.00 | Oct 2, 2026, contract CN261076 ↗ |
| ACS MIX(PG64-22) Grading D | ton | 1,593 | $127.00 | $210.00 | $47.42 – $3,800 | Oct 2, 2026, contract CN261076 ↗ |
| Changeable Message Sign Unit | each | 1,553 | $5,725 | $8,000 | $100.00 – $25,700 | Oct 2, 2026, contract CN261074 ↗ |
| Guardrail Removed | linear foot | 1,477 | $1.20 | $1.00 | $0.01 – $76.14 | Oct 2, 2026, contract CN261065 ↗ |
| Remove of snowplowable reflective marker | each | 1,434 | $10.32 | $95.50 | $0.5 – $500.00 | Oct 2, 2026, contract CN261070 ↗ |
| Cold milling asphalt pavement | ton | 1,410 | $22.99 | $85.00 | $1.00 – $2,200 | Oct 2, 2026, contract CN261076 ↗ |
| Cold milling asphalt pavement | square yard | 1,273 | — | $4.00 | $0.2 – $450.00 | Oct 2, 2026, contract CN264057 ↗ |
| Construction stakes, line and grades | ls | 1,212 | — | $16,275 | $500.00 – $2,650,000 | Oct 2, 2026, contract CN261076 ↗ |
| Paint pavement marking (6 inch line) | l.m. | 1,196 | $1,350 | $9,423 | $80.00 – $25,000 | Oct 2, 2026, contract CN261070 ↗ |
| Snowplowable Raised Pavement Markers (Bi-dir) (1 Color) | each | 1,190 | $38.44 | $38.00 | $17.00 – $1,660 | Oct 2, 2026, contract CN261065 ↗ |
| Water | m.g. | 1,183 | $10.00 | $550.00 | $0.01 – $2,742 | Oct 2, 2026, contract CN261076 ↗ |
| Asphalt Concrete MIX (PG64-22) (Bpmb-hm) Grading B-M2 | ton | 1,153 | $120.00 | $165.00 | $45.00 – $2,960 | Oct 2, 2026, contract CN261076 ↗ |
| Water (seeding & Sodding) | m.g. | 1,150 | — | $320.00 | $0.11 – $5,000 | Oct 2, 2026, contract CN261076 ↗ |
| ACS MIX(PG70-22) Grading D | ton | 1,122 | $114.22 | $192.00 | $60.00 – $3,850 | Oct 2, 2026, contract CN264057 ↗ |
| Sediment remove | cubic yard | 1,101 | — | $85.00 | $0.01 – $1,320 | Oct 2, 2026, contract CN261076 ↗ |
| Flat sheet aluminum sign (0.100 inch thick) | square foot | 1,100 | $14.50 | $11.00 | $8.05 – $810.00 | Oct 2, 2026, contract CN261065 ↗ |
| Interconnected Portable Barrier Rail | linear foot | 1,097 | $31.00 | $55.00 | $0.1 – $300.00 | Oct 2, 2026, contract CN261073 ↗ |
| Perforated/Knockout Square Tube Post | pound | 1,088 | $4.25 | $3.00 | $2.13 – $27.11 | Oct 2, 2026, contract CN261065 ↗ |
| Flat sheet aluminum sign (0.080 inch thick) | square foot | 1,086 | $13.50 | $12.00 | $1.60 – $616.00 | Oct 2, 2026, contract CN263064 ↗ |
| Brooming & degrassing shoulder | l.m. | 1,075 | $1,220 | $21,424 | $50.00 – $42,801 | Oct 2, 2026, contract CN261070 ↗ |
| Asphalt material for prime coat (pc) | ton | 1,067 | $790.63 | $850.00 | $1.00 – $9,000 | Oct 2, 2026, contract CN263064 ↗ |
| Tangent energy absorbing terminal mash tl-3 | each | 1,046 | $3,108 | $3,800 | $25.32 – $7,955 | Oct 2, 2026, contract CN261074 ↗ |
| Temporary Silt Fence (With Backing) | linear foot | 1,018 | $5.00 | $5.90 | $1.30 – $34.60 | Oct 2, 2026, contract CN263064 ↗ |
| Clearing and Grubbing | ls | 993 | — | $3,000 | $1.00 – $7,743,880 | Oct 2, 2026, contract CN261076 ↗ |
| Geotextile (Type Iii)(Erosion Control) | square yard | 977 | $3.50 | $4.50 | $1.00 – $75.00 | Oct 2, 2026, contract CN261076 ↗ |
| Loop Wire | linear foot | 962 | $0.65 | $1.00 | $0.05 – $21.00 | Oct 2, 2026, contract CN264061 ↗ |
| Saw Slot | linear foot | 959 | $4.03 | $7.00 | $0.33 – $19.80 | Oct 2, 2026, contract CN264061 ↗ |
| Temporary barricade (type iii) | linear foot | 932 | $15.00 | $14.00 | $2.12 – $100.00 | Oct 2, 2026, contract CN263064 ↗ |