Other · awarded bid prices · St. Louis County
Pull Box, Preformed Class 2: cost per each in St. Louis County, MO
The median awarded price is $2,340 per each, from 34 winning bids on 29 public projects in St. Louis County, MO (2023–2026). Half of the awarded prices fall between $2,200 and $2,490.
Cost by state › Missouri › St. Louis County › Pull Box, Preformed Class 2
Winning bids only, as printed in the agencies' bid tabulations (MoDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $1,372 in 2021 to $2,450 in 2026 (+79%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2021 | $1,372 | 6 |
| 2022 | $1,762 | 8 |
| 2023 | $2,202 | 6 |
| 2024 | $2,476 | 12 |
| 2025 | $2,248 | 12 |
| 2026 | $2,450 | 8 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Jun 18, 2026 | MoDOT | 1 EA | $2,450 | Open the source page, contract 260618-F01 |
| May 15, 2026 | MoDOT | 1 EA | $3,600 | Open the source page, contract 260515-F02 |
| May 15, 2026 | MoDOT | 21 EA | $2,119 | Open the source page, contract 260515-F03 |
| Apr 17, 2026 | MoDOT | 17 EA | $2,060 | Open the source page, contract 260417-F02 |
| Feb 20, 2026 | MoDOT | 11 EA | $2,330 | Open the source page, contract 260220-F01 |
See every awarded price for this item on the Pull Box, Preformed Class 2 item page.
Related items in St. Louis County
- Substructure Repair (Unformed): $177.25 per square foot
- Half-sole Repair: $158.00 per square foot
- Sh-flat Sheet: $36.00 per square foot
- Pull Box, Preformed Class 1: $1,610 per each
- Shf-flat Sheet Fluorescent: $38.06 per square foot
- Substructure Repair (Formed): $210.00 per square foot
- Type A Crashworthy End Terminal (Mash): $3,900 per each
- Truncated Domes: $27.10 per square foot