Structures · awarded bid prices · St. Louis County
2 In. Psst Post - 12 GA.: cost per linear foot in St. Louis County, MO
The median awarded price is $30.00 per linear foot, from 29 winning bids on 27 public projects in St. Louis County, MO (2023–2026). Half of the awarded prices fall between $27.00 and $32.00.
Cost by state › Missouri › St. Louis County › 2 In. Psst Post - 12 GA.
Winning bids only, as printed in the agencies' bid tabulations (MoDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $22.00 in 2022 to $28.00 in 2025 (+27%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2022 | $22.00 | 6 |
| 2023 | $26.00 | 7 |
| 2024 | $30.00 | 9 |
| 2025 | $28.00 | 15 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Apr 17, 2026 | MoDOT | 565 LF | $32.00 | Open the source page, contract 260417-F02 |
| Mar 20, 2026 | MoDOT | 39 LF | $68.19 | Open the source page, contract 260320-F01 |
| Nov 14, 2025 | MoDOT | 700 LF | $6.31 | Open the source page, contract 251114-F01 |
| Nov 14, 2025 | MoDOT | 556 LF | $32.00 | Open the source page, contract 251114-F02 |
| Nov 14, 2025 | MoDOT | 661 LF | $32.00 | Open the source page, contract 251114-F04 |
The same item across Missouri: statewide figures. See every awarded price for this item on the 2 In. Psst Post - 12 GA. item page.
Related items in St. Louis County
- MGS Guardrail: $29.50 per linear foot
- Concrete Footings, Embedded: $3,200 per cubic yard
- Silicone Expansion Joint Sealant: $42.00 per linear foot
- Pipe Posts: $8.25 per pound
- Temporary Traffic Barrier, Contractor Furnished / Retained: $25.00 per linear foot
- 2.5 In. Psst Post - 12 GA.: $33.00 per linear foot
- Removal of Existing Deck Repair: $22.00 per square foot
- Impact Attenuator (Relocation): $1,000 per each