Traffic · awarded bid prices · Greene County
Preformed Thermoplastic Pavement Marking, Left/Right Arrow: cost per each in Greene County, MO
The median awarded price is $265.75 per each, from 32 winning bids on 17 public projects in Greene County, MO (2021–2025). Half of the awarded prices fall between $249.36 and $303.88.
Cost by state › Missouri › Greene County › Preformed Thermoplastic Pavement Marking, Left/Right Arrow
Winning bids only, as printed in the agencies' bid tabulations (MoDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $263.06 in 2020 to $280.00 in 2024 (+6%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2020 | $263.06 | 7 |
| 2021 | $230.00 | 5 |
| 2022 | $265.00 | 5 |
| 2023 | $249.37 | 13 |
| 2024 | $280.00 | 9 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Oct 17, 2025 | MoDOT | 55 EA | $274.43 | Open the source page, contract 251017-G02 |
| Dec 13, 2024 | MoDOT | 2 EA | $260.00 | Open the source page, contract 241213-G02 |
| Nov 15, 2024 | MoDOT | 29 EA | $280.00 | Open the source page, contract 241115-G3A |
| Apr 19, 2024 | MoDOT | 16 EA | $285.70 | Open the source page, contract 240419-G05 |
| Mar 15, 2024 | MoDOT | 6 EA | $430.20 | Open the source page, contract 240315-G02 |
The same item across Missouri: statewide figures. See every awarded price for this item on the Preformed Thermoplastic Pavement Marking, Left/Right Arrow item page.
Related items in Greene County
- 4 In. Yellow Standard Waterborne Pavement Marking Paint, Type P Beads: $0.4 per linear foot
- 4 In. White Standard Waterborne Pavement Marking Paint, Type P Beads: $0.425 per linear foot
- Construction Signs: $7.88 per square foot
- 6 In. Yellow High Build Waterborne Pavement Marking Paint, Type L Beads: $0.33 per linear foot
- Pavement Marking Removal (Symbols): $102.10 per each
- Preformed Thermoplastic Pavement Marking, 30 in White Midblock: $180.00 per each
- Preformed Thermoplastic Pavement Marking, 12 in White, Yield Line Triangles: $53.30 per each
- Directional Indicator Barricade: $77.88 per each