Other · awarded bid prices · Brevard County
Mitered End Section, Optional: cost per each in Brevard County, FL
The median awarded price is $3,000 per each, from 21 winning bids on 6 public projects in Brevard County, FL (2022–2026). Half of the awarded prices fall between $2,500 and $6,000.
Cost by state › Florida › Brevard County › Mitered End Section, Optional
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $1,750 in 2021 to $3,000 in 2026 (+71%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2021 | $1,750 | 7 |
| 2022 | $2,387 | 7 |
| 2023 | $6,000 | 5 |
| 2026 | $3,000 | 9 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| May 20, 2026 | FDOT | 5 EA | $3,000 | Open bid tab, T5882 ↗ |
| Jan 25, 2023 | FDOT | 40 EA | $3,600 | Open bid tab, T5777 ↗ |
| Dec 7, 2022 | FDOT | 1 EA | $1,900 | Open bid tab, T5767 ↗ |
| Apr 27, 2022 | FDOT | 1 EA | $2,400 | Open bid tab, T5729 ↗ |
| Feb 23, 2022 | FDOT | 1 EA | $2,387 | Open bid tab, T5742 ↗ |
The same item across Florida: statewide figures. See every awarded price for this item on the Mitered End Section, Optional item page.
Related items in Brevard County
- Thermoplastic, Standard, White: $6.38 per linear foot
- Thermoplastic, Preformed: $16.50 per linear foot
- Thermoplastic, Standard, White: $115.00 per each
- Steel Mast Arm Assembly, Furnish: $89,140 per each
- Thermoplastic, Preformed: $210.00 per each
- Uninterruptible Power Supply: $13,141 per each
- Itsfm Location Documentation: $2,184 per each