Street Lighting · awarded bid prices · Brevard County
Conduit, Furnish & Install, Open: cost per linear foot in Brevard County, FL
The median awarded price is $24.16 per linear foot, from 22 winning bids on 11 public projects in Brevard County, FL (2024–2026). Half of the awarded prices fall between $15.82 and $31.22.
Cost by state › Florida › Brevard County › Conduit, Furnish & Install, Open
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $14.16 in 2021 to $10.45 in 2026 (-26%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2021 | $14.16 | 7 |
| 2022 | $20.20 | 13 |
| 2023 | $28.18 | 13 |
| 2024 | $40.29 | 5 |
| 2025 | $22.95 | 10 |
| 2026 | $10.45 | 7 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Jul 29, 2026 | FDOT | 282 LF | $53.55 | Open bid tab, T5891 ↗ |
| May 20, 2026 | FDOT | 8487 LF | $25.37 | Open bid tab, T5882 ↗ |
| Mar 25, 2026 | FDOT | 146 LF | $9.88 | Open bid tab, T5876 ↗ |
| Jul 30, 2025 | FDOT | 725 LF | $17.55 | Open bid tab, T5860 ↗ |
| Jul 30, 2025 | FDOT | 2618 LF | $15.25 | Open bid tab, T5871 ↗ |
The same item across Florida: statewide figures. See every awarded price for this item on the Conduit, Furnish & Install, Open item page.
Related items in Brevard County
- Conduit, Furnish & Install: $47.53 per linear foot
- Pull & Splice Box, F&I, 13" x 24": $1,843 per each
- Electrical Service Wire, Furnish: $9.36 per linear foot
- Electrical Service Disconnect: $1,531 per each
- Prestressed Concrete Pole, F&I: $2,253 per each