Traffic · awarded bid prices · Waukesha County
Marking Line Epoxy 8-Inch: cost per linear foot in Waukesha County, WI
The median awarded price is $1.50 per linear foot, from 15 winning bids on 15 public projects in Waukesha County, WI (2023–2026). Half of the awarded prices fall between $1.30 and $1.98.
Cost by state › Wisconsin › Waukesha County › Marking Line Epoxy 8-Inch
Winning bids only, as printed in the agencies' bid tabulations (WisDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $1.50 in 2020 to $1.35 in 2025 (-10%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2020 | $1.50 | 5 |
| 2022 | $1.55 | 8 |
| 2023 | $1.50 | 7 |
| 2024 | $1.53 | 6 |
| 2025 | $1.35 | 5 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 15, 2026 | WisDOT | 12412 LF | $1.30 | Open bid tab, letting 20260915, call 008 |
| Jan 13, 2026 | WisDOT | 86 LF | $1.95 | Open bid tab, letting 20260113, call 056 |
| Nov 11, 2025 | WisDOT | 249 LF | $1.05 | Open bid tab, letting 20251111, call 011 |
| Sep 9, 2025 | WisDOT | 401 LF | $0.85 | Open bid tab, letting 20250909, call 008 |
| Jun 10, 2025 | WisDOT | 553 LF | $4.85 | Open bid tab, letting 20250610, call 007 |
See every awarded price for this item on the Marking Line Epoxy 8-Inch item page.
Related items in Waukesha County
- Traffic Control Barricades Type III: $0.55 per day
- Traffic Control Signs: $0.37 per day
- Traffic Control Warning Lights Type A: $0.13 per day
- Removing Signs Type II: $35.00 per each
- Removing Small Sign Supports: $35.00 per each
- Traffic Control Drums: $0.155 per day
- Traffic Control Signs Pcms: $30.00 per day
- Signs Type II Reflective F: $24.00 per square foot