Construction unit costs in Wisconsin

Median awarded unit prices for the 60 most-bid items on Wisconsin public projects, from winning bids in agency bid tabulations.

Cost by state › Wisconsin

ItemPerMedianMiddle halfWinning bids
Traffic Control Signsday$0.4$0.27 – $0.65963
Traffic Control Barricades Type IIIday$0.6$0.49 – $1.00894
Tack Coatgallon$3.58$2.88 – $5.71857
Traffic Control Warning Lights Type Aday$0.135$0.1 – $0.24856
Sawing Asphaltlinear foot$1.96$1.68 – $2.95849
Base Aggregate Dense 1 1/4-Inchton$21.08$16.50 – $26.00839
Silt Fencelinear foot$2.25$2.00 – $3.00819
Excavation Commoncubic yard$17.00$12.00 – $22.57816
Base Aggregate Dense 3/4-Inchton$29.58$23.96 – $40.00814
On-the-Job Training Graduate at $5.00/HRhour$5.00$5.00 – $5.00748
On-the-Job Training Apprentice at $5.00/HRhour$5.00$5.00 – $5.00744
Traffic Control Drumsday$0.25$0.19 – $0.5689
Construction Staking Slope Stakeslinear foot$0.98$0.75 – $1.50665
Removing Small Sign Supportseach$30.00$21.50 – $35.00614
Geotextile Type HRsquare yard$5.09$3.96 – $7.00613
Asphaltic Surfaceton$148.94$120.00 – $195.82590
Construction Staking Subgradelinear foot$0.01$0.01 – $0.01587
Removing Signs Type IIeach$30.00$21.06 – $35.94586
Traffic Control Signs Pcmsday$43.00$30.00 – $60.00571
Topsoilsquare yard$5.50$3.50 – $8.90541
Signs Type II Reflective Fsquare foot$25.00$23.00 – $30.00541
Sawing Concretelinear foot$2.57$2.30 – $3.25534
Seeding Temporarypound$4.80$3.50 – $7.00513
Moving Signs Type IIeach$110.00$75.00 – $150.00497
Removing Curb & Gutterlinear foot$7.56$5.00 – $11.67486
Construction Staking Curb Gutter and Curb & Gutterlinear foot$1.50$0.912 – $2.50486
Temporary Ditch Checkslinear foot$8.59$7.50 – $10.00470
Traffic Control Covering Signs Type IIeach$43.91$30.00 – $81.98462
Erosion Mat Urban Class I Type Bsquare yard$2.05$1.80 – $2.68454
Culvert Pipe Checkseach$20.00$15.00 – $25.00449
Grubbingstation$444.70$249.19 – $750.00438
Traffic Control Warning Lights Type Cday$0.15$0.1 – $0.25427
Marking Stop Line Epoxy 18-Inchlinear foot$15.30$13.41 – $18.00426
Removing Asphaltic Surface Millingsquare yard$2.65$1.50 – $4.91423
Bar Steel Reinforcement HS Coated Structurespound$1.49$1.30 – $1.70423
Removing Guardraillinear foot$3.00$2.50 – $4.00422
MGS Guardrail Terminal Eateach$3,750$3,450 – $4,000415
Removing Asphaltic Surfacesquare yard$7.00$4.50 – $12.00409
Inlet Protection Type Ceach$68.00$60.00 – $75.00407
Signs Type II Reflective Hsquare foot$22.90$20.00 – $28.90406
Removing Asphaltic Surface Butt Jointssquare yard$11.65$5.75 – $21.24403
Salvaged Topsoilsquare yard$2.75$1.55 – $4.00401
Riprap Heavycubic yard$83.84$73.54 – $105.00396
Removing Concrete Pavementsquare yard$9.00$5.00 – $16.83393
Asphaltic Surface Driveways and Field Entranceston$187.50$145.00 – $237.82390
Rubberized Membrane Waterproofingsquare yard$50.00$30.00 – $60.00384
Protective Surface Treatmentsquare yard$4.00$3.00 – $5.00383
Geotextile Type DF Schedule asquare yard$5.00$4.00 – $7.00380
Construction Staking Resurfacing Referencelinear foot$0.12$0.09 – $0.2378
MGS Guardrail 3linear foot$28.05$25.88 – $30.00370
Mulchingsquare yard$0.5$0.33 – $1.00363
Riprap Mediumcubic yard$112.08$93.50 – $157.86362
Removing Concrete Sidewalksquare yard$10.00$6.60 – $15.96356
Removing Small Pipe Culvertseach$500.27$400.00 – $854.75356
Inlet Protection Type Aeach$107.17$77.25 – $140.00327
Borrowcubic yard$16.88$10.00 – $25.00304
Marking Line Epoxy 4-Inchlinear foot$1.00$0.6 – $3.00286
Clearingstation$670.00$329.00 – $1,159243
Inlet Protection Type Beach$61.00$50.00 – $74.50223
Topsoilcubic yard$50.58$33.00 – $66.9716