Traffic · awarded bid prices · Waukesha County
Marking Diagonal Epoxy 12-Inch: cost per linear foot in Waukesha County, WI
The median awarded price is $10.00 per linear foot, from 15 winning bids on 15 public projects in Waukesha County, WI (2023–2026). Half of the awarded prices fall between $8.67 and $11.50.
Cost by state › Wisconsin › Waukesha County › Marking Diagonal Epoxy 12-Inch
Winning bids only, as printed in the agencies' bid tabulations (WisDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $10.70 in 2020 to $12.55 in 2025 (+17%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2020 | $10.70 | 8 |
| 2022 | $10.05 | 8 |
| 2023 | $10.50 | 9 |
| 2025 | $12.55 | 6 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 15, 2026 | WisDOT | 3086 LF | $10.00 | Open bid tab, letting 20260915, call 008 |
| Jan 13, 2026 | WisDOT | 41 LF | $10.61 | Open bid tab, letting 20260113, call 022 |
| Jan 13, 2026 | WisDOT | 8377 LF | $11.00 | Open bid tab, letting 20260113, call 056 |
| Nov 11, 2025 | WisDOT | 1242 LF | $15.00 | Open bid tab, letting 20251111, call 011 |
| Oct 14, 2025 | WisDOT | 473 LF | $9.75 | Open bid tab, letting 20251014, call 029 |
See every awarded price for this item on the Marking Diagonal Epoxy 12-Inch item page.
Related items in Waukesha County
- Traffic Control Barricades Type III: $0.55 per day
- Traffic Control Signs: $0.37 per day
- Traffic Control Warning Lights Type A: $0.13 per day
- Removing Signs Type II: $35.00 per each
- Removing Small Sign Supports: $35.00 per each
- Traffic Control Drums: $0.155 per day
- Traffic Control Signs Pcms: $30.00 per day
- Signs Type II Reflective F: $24.00 per square foot