Traffic · awarded bid prices · Waukesha County
Marking Crosswalk Epoxy Transverse Line 6-Inch: cost per linear foot in Waukesha County, WI
The median awarded price is $10.75 per linear foot, from 15 winning bids on 15 public projects in Waukesha County, WI (2023–2026). Half of the awarded prices fall between $9.75 and $11.55.
Cost by state › Wisconsin › Waukesha County › Marking Crosswalk Epoxy Transverse Line 6-Inch
Winning bids only, as printed in the agencies' bid tabulations (WisDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $9.50 in 2020 to $11.00 in 2025 (+16%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2020 | $9.50 | 7 |
| 2022 | $8.10 | 5 |
| 2023 | $10.50 | 8 |
| 2025 | $11.00 | 7 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 15, 2026 | WisDOT | 357 LF | $11.25 | Open bid tab, letting 20260915, call 008 |
| Jun 9, 2026 | WisDOT | 2921 LF | $13.25 | Open bid tab, letting 20260609, call 001 |
| Nov 11, 2025 | WisDOT | 1008 LF | $15.00 | Open bid tab, letting 20251111, call 011 |
| Oct 14, 2025 | WisDOT | 4942 LF | $10.25 | Open bid tab, letting 20251014, call 029 |
| Sep 9, 2025 | WisDOT | 3437 LF | $11.60 | Open bid tab, letting 20250909, call 008 |
See every awarded price for this item on the Marking Crosswalk Epoxy Transverse Line 6-Inch item page.
Related items in Waukesha County
- Traffic Control Barricades Type III: $0.55 per day
- Traffic Control Signs: $0.37 per day
- Traffic Control Warning Lights Type A: $0.13 per day
- Removing Signs Type II: $35.00 per each
- Removing Small Sign Supports: $35.00 per each
- Traffic Control Drums: $0.155 per day
- Traffic Control Signs Pcms: $30.00 per day
- Signs Type II Reflective F: $24.00 per square foot