Traffic · awarded bid prices · Outagamie County
Marking Stop Line Epoxy 18-Inch: cost per linear foot in Outagamie County, WI
The median awarded price is $16.00 per linear foot, from 18 winning bids on 18 public projects in Outagamie County, WI (2023–2026). Half of the awarded prices fall between $15.04 and $17.97.
Cost by state › Wisconsin › Outagamie County › Marking Stop Line Epoxy 18-Inch
Winning bids only, as printed in the agencies' bid tabulations (WisDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $14.25 in 2023 to $17.00 in 2025 (+19%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2023 | $14.25 | 6 |
| 2024 | $15.50 | 5 |
| 2025 | $17.00 | 8 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Jul 14, 2026 | WisDOT | 115 LF | $18.95 | Open bid tab, letting 20260714, call 005 |
| Mar 10, 2026 | WisDOT | 175 LF | $17.88 | Open bid tab, letting 20260310, call 023 |
| Mar 10, 2026 | WisDOT | 38 LF | $15.95 | Open bid tab, letting 20260310, call 045 |
| Feb 10, 2026 | WisDOT | 570 LF | $16.53 | Open bid tab, letting 20260210, call 022 |
| Nov 11, 2025 | WisDOT | 35 LF | $18.90 | Open bid tab, letting 20251111, call 014 |
The same item across Wisconsin: statewide figures. See every awarded price for this item on the Marking Stop Line Epoxy 18-Inch item page.
Related items in Outagamie County
- Traffic Control Signs: $0.3 per day
- Traffic Control Barricades Type III: $0.55 per day
- Traffic Control Warning Lights Type A: $0.15 per day
- Traffic Control Signs Pcms: $45.25 per day
- Traffic Control Drums: $0.2 per day
- Marking Line Epoxy 6-Inch: $0.85 per linear foot
- Removing Small Sign Supports: $37.50 per each
- Removing Signs Type II: $35.00 per each