Traffic · awarded bid prices · Marathon County
Marking Line Epoxy 6-Inch: cost per linear foot in Marathon County, WI
The median awarded price is $0.875 per linear foot, from 20 winning bids on 20 public projects in Marathon County, WI (2023–2026). Half of the awarded prices fall between $0.725 and $2.12.
Cost by state › Wisconsin › Marathon County › Marking Line Epoxy 6-Inch
Winning bids only, as printed in the agencies' bid tabulations (WisDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $0.75 in 2024 to $0.875 in 2025 (+17%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2024 | $0.75 | 5 |
| 2025 | $0.875 | 10 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Aug 11, 2026 | WisDOT | 3110 LF | $0.75 | Open bid tab, letting 20260811, call 017 |
| May 12, 2026 | WisDOT | 1435 LF | $3.50 | Open bid tab, letting 20260512, call 014 |
| Mar 10, 2026 | WisDOT | 2010 LF | $2.50 | Open bid tab, letting 20260310, call 032 |
| Mar 10, 2026 | WisDOT | 1350 LF | $3.60 | Open bid tab, letting 20260310, call 033 |
| Dec 9, 2025 | WisDOT | 175 LF | $1.25 | Open bid tab, letting 20251209, call 032 |
See every awarded price for this item on the Marking Line Epoxy 6-Inch item page.
Related items in Marathon County
- Traffic Control Signs: $0.4 per day
- Traffic Control Barricades Type III: $0.5 per day
- Traffic Control Warning Lights Type A: $0.1 per day
- Removing Signs Type II: $21.50 per each
- Traffic Control Covering Signs Type II: $30.00 per each
- Signs Type II Reflective F: $30.00 per square foot
- Traffic Control Drums: $0.45 per day
- Marking Removal Line 4-Inch: $0.85 per linear foot