Traffic · awarded bid prices · Marathon County
Marking Line Epoxy 4-Inch: cost per linear foot in Marathon County, WI
The median awarded price is $2.90 per linear foot, from 13 winning bids on 13 public projects in Marathon County, WI (2023–2026). Half of the awarded prices fall between $0.85 and $3.30.
Cost by state › Wisconsin › Marathon County › Marking Line Epoxy 4-Inch
Winning bids only, as printed in the agencies' bid tabulations (WisDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $0.675 in 2019 to $3.00 in 2025 (+344%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2019 | $0.675 | 6 |
| 2020 | $2.55 | 5 |
| 2022 | $0.8 | 12 |
| 2023 | $1.00 | 9 |
| 2024 | $2.90 | 5 |
| 2025 | $3.00 | 5 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Jan 13, 2026 | WisDOT | 1210 LF | $4.30 | Open bid tab, letting 20260113, call 029 |
| Oct 14, 2025 | WisDOT | 3770 LF | $1.05 | Open bid tab, letting 20251014, call 014 |
| Apr 8, 2025 | WisDOT | 1020 LF | $4.85 | Open bid tab, letting 20250408, call 028 |
| Mar 11, 2025 | WisDOT | 210 LF | $1.10 | Open bid tab, letting 20250311, call 033 |
| Feb 11, 2025 | WisDOT | 2100 LF | $3.00 | Open bid tab, letting 20250211, call 034 |
The same item across Wisconsin: statewide figures. See every awarded price for this item on the Marking Line Epoxy 4-Inch item page.
Related items in Marathon County
- Traffic Control Signs: $0.4 per day
- Traffic Control Barricades Type III: $0.5 per day
- Traffic Control Warning Lights Type A: $0.1 per day
- Removing Signs Type II: $21.50 per each
- Traffic Control Covering Signs Type II: $30.00 per each
- Signs Type II Reflective F: $30.00 per square foot
- Traffic Control Drums: $0.45 per day
- Marking Removal Line 4-Inch: $0.85 per linear foot