ItemPerMedianMiddle halfWinning bidsLatest source document
Traffic control barricade type iiiday$0.6$0.435 – $0.92547Sep 15, 2026, Open bid tab, letting 20260915, call 003
Traffic control signday$0.25$0.205 – $0.36547Sep 15, 2026, Open bid tab, letting 20260915, call 003
Traffic Controleach$14,585$6,808 – $33,22547Sep 15, 2026, Open bid tab, letting 20260915, call 003
Traffic Control Warning Lights Type Aday$0.12$0.1 – $0.17246Sep 15, 2026, Open bid tab, letting 20260915, call 003
Base Aggregate Dense 1 1/4-Inchton$18.10$14.75 – $21.1544Sep 15, 2026, Open bid tab, letting 20260915, call 003
Sawing Asphaltlinear foot$1.68$1.30 – $1.9844Sep 15, 2026, Open bid tab, letting 20260915, call 003
Traffic control sign pcmsday$37.25$30.00 – $51.0043Sep 15, 2026, Open bid tab, letting 20260915, call 003
Excavation Commoncubic yard$14.00$11.43 – $18.9943Sep 15, 2026, Open bid tab, letting 20260915, call 003
Silt Fencelinear foot$2.25$1.95 – $2.5041Sep 15, 2026, Open bid tab, letting 20260915, call 003
Base Aggregate Dense 3/4-Inchton$26.25$22.84 – $32.6040Sep 15, 2026, Open bid tab, letting 20260915, call 003
Silt Fence Maintenancelinear foot$0.01$0.01 – $0.0140Sep 15, 2026, Open bid tab, letting 20260915, call 003
Traffic Control Drumsday$0.2$0.15 – $0.2538Sep 15, 2026, Open bid tab, letting 20260915, call 003
Construction Staking Subgradelinear foot$0.01$0.01 – $0.0138Sep 15, 2026, Open bid tab, letting 20260915, call 003
Remove small sign supportseach$35.00$35.00 – $35.7537Sep 15, 2026, Open bid tab, letting 20260915, call 003
Remove sign type iieach$35.00$35.00 – $36.1236Sep 15, 2026, Open bid tab, letting 20260915, call 003
Moving sign type iieach$175.00$150.00 – $200.0034Sep 15, 2026, Open bid tab, letting 20260915, call 003
Geotextile Type HRsquare yard$4.00$3.19 – $6.0032Sep 15, 2026, Open bid tab, letting 20260915, call 003
Sawing Concretelinear foot$2.25$2.15 – $2.5131Sep 15, 2026, Open bid tab, letting 20260915, call 003
Remove curb & gutterlinear foot$6.20$4.93 – $8.3631Sep 15, 2026, Open bid tab, letting 20260915, call 003
Sign type ii reflective fsquare foot$24.50$21.12 – $28.0030Sep 15, 2026, Open bid tab, letting 20260915, call 003
Construction Staking Curb Gutter and Curb & Gutterlinear foot$1.55$1.00 – $2.4430Sep 15, 2026, Open bid tab, letting 20260915, call 003
Traffic control covering sign type iieach$50.00$30.00 – $80.0029Jul 14, 2026, Open bid tab, letting 20260714, call 002
Construction Staking Storm Sewereach$150.00$100.00 – $200.0028Sep 15, 2026, Open bid tab, letting 20260915, call 003
Sign type ii reflective hsquare foot$20.75$20.00 – $25.0027Sep 15, 2026, Open bid tab, letting 20260915, call 003
Piling Steel HP 10-Inch x 42 Lblinear foot$58.00$50.00 – $63.7526Aug 11, 2026, Open bid tab, letting 20260811, call 006
Culvert Pipe Checkseach$20.00$18.00 – $25.0026Sep 15, 2026, Open bid tab, letting 20260915, call 003
Inlet Protection Type Ceach$67.00$60.00 – $75.0026Sep 15, 2026, Open bid tab, letting 20260915, call 003
Erosion Mat Urban Class I Type Bsquare yard$1.90$1.65 – $2.2525Sep 15, 2026, Open bid tab, letting 20260915, call 003
Traffic Control Warning Lights Type Cday$0.15$0.12 – $0.225Aug 11, 2026, Open bid tab, letting 20260811, call 007
Marking Line Epoxy 8-Inchlinear foot$1.35$1.00 – $2.7825Sep 15, 2026, Open bid tab, letting 20260915, call 003
Remove asphalt surfacesquare yard$6.00$3.88 – $11.6025Aug 11, 2026, Open bid tab, letting 20260811, call 007
Temporary Ditch Checkslinear foot$9.00$8.50 – $10.0025Sep 15, 2026, Open bid tab, letting 20260915, call 003
Seeding Temporarypound$3.88$3.50 – $5.7524Aug 11, 2026, Open bid tab, letting 20260811, call 006
Remove inleteach$554.85$500.00 – $712.7524Sep 15, 2026, Open bid tab, letting 20260915, call 003
Topsoilsquare yard$5.00$2.77 – $7.3623Sep 15, 2026, Open bid tab, letting 20260915, call 003
Marking Arrow Epoxyeach$275.00$230.00 – $345.0023Sep 15, 2026, Open bid tab, letting 20260915, call 003
Riprap Mediumcubic yard$101.12$94.05 – $146.5023Aug 11, 2026, Open bid tab, letting 20260811, call 007
MGS Guardrail Terminal Eateach$3,900$3,700 – $4,00023Jul 14, 2026, Open bid tab, letting 20260714, call 002
Traffic Control Arrow Boardsday$12.50$9.25 – $19.9923Oct 14, 2025, Open bid tab, letting 20251014, call 002
Remove small pipe culverteach$500.00$413.03 – $788.5023Sep 15, 2026, Open bid tab, letting 20260915, call 003
Asphalt surfaceton$120.00$95.10 – $160.0623Aug 11, 2026, Open bid tab, letting 20260811, call 006
Remove concrete sidewalksquare yard$10.04$7.06 – $20.7523Sep 15, 2026, Open bid tab, letting 20260915, call 003
Construction staking pipe culverteach$200.00$105.00 – $280.0023Sep 15, 2026, Open bid tab, letting 20260915, call 003
Bar steel reinforced hs coated structurepound$1.50$1.33 – $1.5422Aug 11, 2026, Open bid tab, letting 20260811, call 006
Conduit Rigid Nonmetallic Schedule 40 2-Inchlinear foot$9.00$8.00 – $10.1922Sep 15, 2026, Open bid tab, letting 20260915, call 003
Concrete Curb & Gutter 30-Inch Type Dlinear foot$28.57$23.62 – $43.5622Aug 11, 2026, Open bid tab, letting 20260811, call 007
Bar steel reinforced hs structurepound$1.30$1.25 – $1.4322Aug 11, 2026, Open bid tab, letting 20260811, call 006
Pipe Underdrain Wrapped 6-Inchlinear foot$7.00$4.62 – $9.0022Aug 11, 2026, Open bid tab, letting 20260811, call 006
Inlet Protection Type Aeach$105.00$75.00 – $128.7522Sep 15, 2026, Open bid tab, letting 20260915, call 003
Remove guardraillinear foot$4.00$2.46 – $5.0022Aug 11, 2026, Open bid tab, letting 20260811, call 007
Rubberized Membrane Waterproofingsquare yard$44.00$37.00 – $60.0021Aug 11, 2026, Open bid tab, letting 20260811, call 006
Temporary Pedestrian Barricadelinear foot$5.60$4.20 – $7.5021Sep 15, 2026, Open bid tab, letting 20260915, call 003
Marking Stop Line Epoxy 18-Inchlinear foot$14.25$13.25 – $15.6521Aug 11, 2026, Open bid tab, letting 20260811, call 007
Construction staking curb rampeach$210.00$150.00 – $300.0021Aug 11, 2026, Open bid tab, letting 20260811, call 007
Post wood 4x6-inch x 16-fteach$95.00$90.00 – $95.0021Aug 11, 2026, Open bid tab, letting 20260811, call 007
Inlet 2x3-fteach$2,300$2,076 – $2,66521Sep 15, 2026, Open bid tab, letting 20260915, call 003
Seeding Mixture No. 40pound$15.00$12.50 – $19.0021Sep 15, 2026, Open bid tab, letting 20260915, call 003
Remove concrete pavementsquare yard$10.00$4.25 – $11.5021Aug 11, 2026, Open bid tab, letting 20260811, call 007
Construction Staking Resurfacing Referencelinear foot$0.16$0.12 – $0.221Feb 10, 2026, Open bid tab, letting 20260210, call 007
Asphalt surface driveway and field entranceston$155.00$118.75 – $207.9120Sep 15, 2026, Open bid tab, letting 20260915, call 003
Backfill Structure Type Aton$25.50$22.56 – $30.4120Aug 11, 2026, Open bid tab, letting 20260811, call 006
Marking Island Nose Epoxyeach$289.00$267.38 – $310.4520Sep 15, 2026, Open bid tab, letting 20260915, call 003
Marking remove line 4-inchlinear foot$0.73$0.438 – $1.0020Sep 15, 2026, Open bid tab, letting 20260915, call 003
Riprap Heavycubic yard$82.65$72.38 – $106.1620Sep 15, 2026, Open bid tab, letting 20260915, call 003
MGS Guardrail 3linear foot$29.50$27.94 – $30.0020Jul 14, 2026, Open bid tab, letting 20260714, call 002
Post wood 4x6-inch x 14-fteach$88.50$85.00 – $98.5020Aug 11, 2026, Open bid tab, letting 20260811, call 006
Select Crushed Materialton$15.46$13.38 – $17.6120Aug 11, 2026, Open bid tab, letting 20260811, call 007
Seeding Mixture No. 20pound$10.00$7.95 – $20.0020Aug 11, 2026, Open bid tab, letting 20260811, call 006
Marking Line Epoxy 6-Inchlinear foot$0.835$0.5 – $1.1820Sep 15, 2026, Open bid tab, letting 20260915, call 003
Clearingstation$465.00$373.33 – $711.0020Sep 15, 2026, Open bid tab, letting 20260915, call 003
Grubbingstation$237.50$158.25 – $420.0620Sep 15, 2026, Open bid tab, letting 20260915, call 003
Protective Surface Treatmentsquare yard$5.10$3.93 – $7.0020Aug 11, 2026, Open bid tab, letting 20260811, call 006
Marking Line Epoxy 4-Inchlinear foot$0.6$0.4 – $1.8519Sep 15, 2026, Open bid tab, letting 20260915, call 003
Marking Diagonal Epoxy 12-Inchlinear foot$14.00$11.50 – $15.6019Sep 15, 2026, Open bid tab, letting 20260915, call 003
Marking Curb Epoxylinear foot$7.75$7.46 – $8.3219Sep 15, 2026, Open bid tab, letting 20260915, call 003
Concrete Masonry Bridgescubic yard$880.00$746.00 – $1,07319Aug 11, 2026, Open bid tab, letting 20260811, call 006
Concrete Collars for Pipeeach$623.12$531.61 – $865.7519Aug 11, 2026, Open bid tab, letting 20260811, call 007
Concrete Sidewalk 5-Inchsquare foot$7.35$6.55 – $10.4519Sep 15, 2026, Open bid tab, letting 20260915, call 003
Concrete Median Sloped Nosesquare foot$12.75$11.00 – $13.5219Sep 15, 2026, Open bid tab, letting 20260915, call 003
Geotextile Type DF Schedule asquare yard$3.50$2.16 – $8.0019Aug 11, 2026, Open bid tab, letting 20260811, call 006