Paving · awarded bid prices
Hot mix asphalt class. 3/8 in. pg 64h-28: cost per ton in Washington
Listed by the agency as “HMA CL. 3/8 IN. PG 64H-28”.
The median awarded price is $130.00 per ton, from 27 winning bids on 27 public projects in Washington (2024–2026). Half of the awarded prices fall between $99.90 and $153.00.
Cost by state › Washington › HMA CL. 3/8 IN. PG 64H-28
Winning bids only, as printed in the agencies' bid tabulations (WSDOT). These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $76.25 in 2021 to $123.00 in 2026 (+61%).
| Year | Median per ton | Winning bids |
|---|---|---|
| 2021 | $76.25 | 8 |
| 2022 | $109.00 | 22 |
| 2023 | $115.00 | 11 |
| 2024 | $123.50 | 8 |
| 2025 | $144.00 | 11 |
| 2026 | $123.00 | 8 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 23, 2026 | WSDOT | 890 TON | $195.00 | line 19 ↗ |
| May 6, 2026 | WSDOT | 3260 TON | $145.00 | line 22 ↗ |
| May 6, 2026 | WSDOT | 37070 TON | $116.00 | line 25 ↗ |
| Apr 29, 2026 | WSDOT | 12440 TON | $85.00 | line 13 ↗ |
| Apr 22, 2026 | WSDOT | 34700 TON | $88.80 | line 12 ↗ |
See every awarded price for this item, in all states, on the HMA CL. 3/8 IN. PG 64H-28 item page.
Related items in Washington
- Planing Bituminous Pavement: $5.00 per square yard
- Crushed Surfacing Base Course: $55.50 per ton
- HMA Sawcut and Seal: $40.00 per linear foot
- Pavement Repair Excavation Incl. Haul: $20.00 per square yard
- HMA CL. 1/2 in. PG 58H-22: $149.72 per ton
- Cement Conc. Sidewalk: $92.50 per square yard
- Asphalt for Fog Seal: $1,000 per ton
- Extruded Curb: $33.51 per linear foot
Free account: new awarded prices for this item show on your watchlist.