Street Lighting · awarded bid prices · Hidalgo County
Ground box type d (162922)w/apron: cost per each in Hidalgo County, TX
Listed by the agency as “Ground Box TY D (162922)W/Apron”.
The median awarded price is $1,432 per each, from 16 winning bids on 16 public projects in Hidalgo County, TX (2024–2026). Half of the awarded prices fall between $1,138 and $1,718.
Cost by state › Texas › Hidalgo County › Ground Box TY D (162922)W/Apron
Winning bids only, as printed in the agencies' bid tabulations (TxDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $1,420 in 2024 to $1,839 in 2026 (+30%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2024 | $1,420 | 6 |
| 2026 | $1,839 | 6 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 2, 2026 | TxDOT | 4 EA | $1,995 | line 35 ↗ |
| Sep 2, 2026 | TxDOT | 4 EA | $1,678 | line 19 ↗ |
| Jun 3, 2026 | TxDOT | 5 EA | $2,000 | line 50 ↗ |
| May 7, 2026 | TxDOT | 3 EA | $1,840 | line 137 ↗ |
| May 6, 2026 | TxDOT | 2 EA | $1,838 | line 148 ↗ |
The same item across Texas: statewide figures. See every awarded price for this item on the Ground Box TY D (162922)W/Apron item page.
Related items in Hidalgo County
- Elec Condr (NO.6) Bare: $2.10 per linear foot
- Condt (PVC) (Sch 40) (2"): $14.30 per linear foot
- VEH Sig Sec (12")LED(YEL): $288.53 per each
- Elec Condr (NO.6) Insulated: $2.23 per linear foot
- Ground Box TY A (122311)W/Apron: $1,109 per each
- VEH Sig Sec (12")LED(Red): $291.46 per each
- Elec Condr (NO.8) Bare: $1.81 per linear foot
- Tray Cable (4 Condr) (12 Awg): $2.85 per linear foot