Erosion Control · awarded bid prices · Denton County
Rock filter dams (install) (type 2): cost per linear foot in Denton County, TX
Listed by the agency as “Rock Filter Dams (Install) (TY 2)”.
The median awarded price is $42.88 per linear foot, from 12 winning bids on 12 public projects in Denton County, TX (2024–2026). Half of the awarded prices fall between $39.49 and $46.50.
Cost by state › Texas › Denton County › Rock Filter Dams (Install) (TY 2)
Winning bids only, as printed in the agencies' bid tabulations (TxDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $31.00 in 2022 to $39.14 in 2025 (+26%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2022 | $31.00 | 7 |
| 2025 | $39.14 | 6 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Nov 4, 2026 | TxDOT | 1454 LF | $45.00 | line 130 ↗ |
| May 6, 2026 | TxDOT | 2212 LF | $40.75 | line 132 ↗ |
| Jan 7, 2026 | TxDOT | 125 LF | $40.01 | line 36 ↗ |
| Nov 5, 2025 | TxDOT | 325 LF | $39.84 | line 52 ↗ |
| Sep 5, 2025 | TxDOT | 1100 LF | $48.00 | line 53 ↗ |
The same item across Texas: statewide figures. See every awarded price for this item on the Rock Filter Dams (Install) (TY 2) item page.
Related items in Denton County
- Biodeg Erosn Cont Logs (Remove): $1.00 per linear foot
- Construction Exits (Remove): $10.00 per square yard
- Biodeg Erosn Cont Logs (Instl) (12"): $7.00 per linear foot
- Rock Filter Dams (Remove): $13.58 per linear foot
- Construction Exits (Install) (TY 1): $30.62 per square yard