Other · awarded bid prices
Structure steel: cost per pound in South Carolina
Listed by the agency as “Structural Steel”.
The median awarded price is $16.00 per pound, from 16 winning bids on 16 public projects in South Carolina (2023–2026). Half of the awarded prices fall between $10.88 and $20.00.
Cost by state › South Carolina › Structural Steel
Winning bids only, as printed in the agencies' bid tabulations (SCDOT). These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $17.00 in 2023 to $16.00 in 2025 (-6%).
| Year | Median per pound | Winning bids |
|---|---|---|
| 2023 | $17.00 | 8 |
| 2025 | $16.00 | 9 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Apr 14, 2026 | SCDOT | 273898 LB | $7.00 | Open bid tab, contract 2375350 ↗ |
| Nov 12, 2025 | SCDOT | 49727 LB | $4.00 | Open bid tab, contract 1472080 ↗ |
| Oct 14, 2025 | SCDOT | 10395 LB | $17.00 | Open bid tab, contract 4069040 ↗ |
| Sep 9, 2025 | SCDOT | 1890 LB | $29.00 | Open bid tab, contract 2370030 ↗ |
| Aug 12, 2025 | SCDOT | 3596 LB | $20.00 | Open bid tab, contract 5370010 ↗ |
See every awarded price for this item, in all states, on the Structural Steel item page.
Structural Steel in other states
- Iowa: median $5.50 (188 bids)
- Oklahoma: median $4.00 (113 bids)
- Alabama: median $8.00 (31 bids)
- California: median $20.00 (18 bids)
Related items in South Carolina
- 4" Yellow Solid Lines(Pvt.Edge Lines) THERMO-90 Mil.: $0.5 per linear foot
- 24" White Solid Lines (Stop/Diag Lines)-THERMO.-125 MIL: $10.00 per linear foot
- 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil.: $0.5 per linear foot
- 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint: $0.135 per linear foot
- 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint: $0.135 per linear foot
- 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint: $1.00 per linear foot
- 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint: $0.13 per linear foot
- Permanent Grassing for Non-permitted Resurfacing Projects: $3,360 per acre
Free account: new awarded prices for this item show on your watchlist.