Other · awarded bid prices
Sealer Crack Preparation: cost per linear foot in Oklahoma
The median awarded price is $4.30 per linear foot, from 204 winning bids on 66 public projects in Oklahoma (2021–2023). Half of the awarded prices fall between $3.52 and $5.00.
Cost by state › Oklahoma › Sealer Crack Preparation
$4.30median per linear foot
$3.52 – $5.00middle half (25th–75th percentile)
204winning bids, 66 source documents
2021–2023lettings covered (last 5 years)
Winning bids only, as printed in the agencies' bid tabulations (Oklahoma DOT). These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $4.21 in 2018 to $4.30 in 2022 (+2%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2018 | $4.21 | 18 |
| 2019 | $4.00 | 153 |
| 2020 | $4.76 | 126 |
| 2021 | $4.00 | 132 |
| 2022 | $4.30 | 189 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Jan 12, 2023 | Oklahoma DOT | 250 LF | $5.50 | contract 230021 ↗ |
| Jan 12, 2023 | Oklahoma DOT | 157.9 LF | $2.25 | contract 230023 ↗ |
| Dec 22, 2022 | Oklahoma DOT | 123 LF | $5.00 | contract 220339 ↗ |
| Dec 22, 2022 | Oklahoma DOT | 85 LF | $5.00 | contract 220362 ↗ |
| Dec 22, 2022 | Oklahoma DOT | 123 LF | $5.00 | contract 220364 ↗ |
See every awarded price for this item, in all states, on the Sealer Crack Preparation item page.
Related items in Oklahoma
- Reinforcing Steel: $1.58 per pound
- Temporary Silt Dike: $15.12 per linear foot
- Epoxy Coated Reinforcing Steel: $1.66 per pound
- 6" Perforated Pipe Underdrain Round: $30.00 per linear foot
- Saw-cut Grooving: $5.15 per square yard
- Structural Steel: $4.00 per pound
- 6" Non-perf.Pipe Underdrain Rnd.: $30.00 per linear foot
- Deliver Portable Longitudinal Barrier: $25.00 per linear foot
Free account: new awarded prices for this item show on your watchlist.