Traffic · awarded bid prices · Clay County
Construction sign: cost per square foot in Clay County, MO
Listed by the agency as “Construction Signs”.
The median awarded price is $6.00 per square foot, from 27 winning bids on 24 public projects in Clay County, MO (2023–2026). Half of the awarded prices fall between $5.00 and $6.75.
Cost by state › Missouri › Clay County › Construction Signs
Winning bids only, as printed in the agencies' bid tabulations (MoDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $5.50 in 2020 to $5.51 in 2026 (+0%).
| Year | Median per square foot | Winning bids |
|---|---|---|
| 2020 | $5.50 | 7 |
| 2022 | $6.25 | 11 |
| 2023 | $7.40 | 12 |
| 2024 | $5.00 | 11 |
| 2025 | $6.50 | 8 |
| 2026 | $5.51 | 7 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| May 15, 2026 | MoDOT | 1592 SQFT | $5.00 | Open the source page, contract 260515-C05 |
| May 15, 2026 | MoDOT | 501 SQFT | $9.20 | Open the source page, contract 260515-C06 |
| May 15, 2026 | MoDOT | 483 SQFT | $4.60 | Open the source page, contract 260515-C07 |
| May 15, 2026 | MoDOT | 205 SQFT | $6.00 | Open the source page, contract 260515-C09 |
| Apr 17, 2026 | MoDOT | 308 SQFT | $6.17 | Open the source page, contract 260417-C06 |
The same item across Missouri: statewide figures. See every awarded price for this item on the Construction Signs item page.
Related items in Clay County
- 6 In. White High Build Waterborne Pavement Marking Paint, Type L Beads: $0.305 per linear foot
- Changeable Message Sign Without Communication Interface, CON Tractor Furnished, Contractor Retained: $2,925 per each
- Truck or Trailer Mounted Attenuator (Tma): $2,500 per each
- Type III Moveable Barricade: $165.00 per each
- Preformed Thermoplastic Pavement Marking, 24 in. White: $21.75 per linear foot
- Preformed Thermoplastic Pavement Marking, Left/Right Arrow: $345.00 per each
- Bituminous Shoulder Rumble Strip: $16.75 per station