| Perforated square steel tube post | linear foot | $15.00 | $14.00 – $17.25 | 31 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Type b sign, extruded aluminum structure panel | square foot | $32.00 | $29.38 – $34.50 | 31 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Remove of type b sign assembly | each | $632.50 | $556.25 – $800.00 | 30 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Perforated Square Steel Tube Post Anchor, Triangular Slip Base Assembly | each | $612.50 | $500.00 – $832.00 | 30 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Concrete footing for breakaway sign post, 2'-8 inch diameter. x 7'-6 inch | each | $1,700 | $1,650 – $2,040 | 27 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Steel breakaway sign post for type a or b sign, w 8 x 21 | linear foot | $85.00 | $78.00 – $90.50 | 27 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Concrete footing for breakaway sign post, 2'-8 inch diameter. x 9'-0 inch | each | $1,920 | $1,750 – $2,250 | 25 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Steel breakaway sign post for type a or b sign, w 12 x 26 | linear foot | $93.00 | $85.00 – $100.00 | 25 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Remove of type a sign assembly | each | $175.00 | $137.50 – $225.00 | 23 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Remove of concrete footings of highway sign | each | $650.00 | $510.00 – $850.00 | 22 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Remove and Reinstall Sign as per Plan | each | $900.00 | $365.00 – $1,554 | 21 | Oct 20, 2026, contract 00-000T-474 ↗ |