| Construction Sign, Type A | each | $213.00 | $195.00 – $328.50 | 59 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Flashing Arrow Sign | day | $25.00 | $17.00 – $50.00 | 57 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Service Point , | each | $6,600 | $3,900 – $8,050 | 52 | Mar 12, 2025, Mar 12, 2025 letting ↗ |
| Construction Sign, a | each | $200.00 | $190.00 – $275.00 | 49 | May 10, 2023, May 10, 2023 letting ↗ |
| Construction Sign, Type B | each | $111.50 | $100.00 – $148.75 | 34 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Guardrail END Treatment, Type SKT-350 | each | $487.50 | $350.00 – $787.50 | 34 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Portable Changeable Message Sign | each | $5,000 | $2,500 – $6,287 | 34 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Construction Sign, B | each | $102.00 | $96.00 – $142.00 | 29 | May 10, 2023, May 10, 2023 letting ↗ |
| Litter, Remove | mile | $600.00 | $515.00 – $750.00 | 28 | Mar 12, 2025, Mar 12, 2025 letting ↗ |
| CAT Unit Complete Without Foundation Tubes OR Soil Plates Above Ground Components Only | each | $6,100 | $3,550 – $7,800 | 27 | Sep 10, 2025, Sep 10, 2025 letting ↗ |
| Snowplowable Raised Pavement Marker | each | $34.55 | $30.00 – $52.50 | 27 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Tree 10 in., Remove | each | $900.00 | $640.00 – $1,030 | 25 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| Temporary Pavement Marking, Removable, 4 IN. | linear foot | $2.00 | $1.45 – $2.45 | 24 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Conduit, Steel, Galvanized, 2 IN. | linear foot | $52.50 | $43.00 – $60.00 | 24 | Jul 8, 2026, Jul 8, 2026 letting ↗ |
| Tree 30 in., Remove | each | $2,380 | $2,075 – $3,000 | 24 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| Tree 18 in., Remove | each | $1,375 | $990.00 – $1,800 | 24 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| Snowplowable Raised Pavement Marker, Remove | each | $12.92 | $10.00 – $24.62 | 23 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Tree 6 In., Remove | each | $600.00 | $400.00 – $650.00 | 23 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| Light Pole | each | $3,300 | $3,100 – $3,850 | 23 | Apr 8, 2026, Apr 8, 2026 letting ↗ |
| Guardrail End Treatment, Os | each | $3,595 | $1,675 – $4,495 | 22 | May 10, 2023, May 10, 2023 letting ↗ |
| Computer System Equipment | each | $905.00 | $681.25 – $1,500 | 22 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Guardrail, MGS W-beam, 6 FT 3 IN. Spacing | linear foot | $28.00 | $25.00 – $35.00 | 21 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Sign, Sheet, With Legend, 0.080 IN. | square foot | $27.00 | $15.00 – $29.10 | 21 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Prismatic Reflector | each | $6.50 | $5.75 – $8.45 | 21 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Sign, Sheet, With Legend, 0.100 IN. | square foot | $25.50 | $18.88 – $32.10 | 20 | Feb 11, 2026, Feb 11, 2026 letting ↗ |
| Traffic Signal Equipment, Remove | each | $2,000 | $1,000 – $2,600 | 20 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Tree 48 In., Remove | each | $4,300 | $3,518 – $5,000 | 20 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| ITS Field Switch | each | $3,200 | $1,712 – $3,400 | 20 | Mar 12, 2025, Mar 12, 2025 letting ↗ |
| Compaction aggregate no. 53 | ton | $115.00 | $100.00 – $144.12 | 18 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| Handhole, Signal, Type 1 | each | $2,200 | $2,000 – $2,502 | 18 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| ITS Controller Cabinet | each | $13,000 | $12,500 – $13,500 | 18 | Mar 12, 2025, Mar 12, 2025 letting ↗ |
| Barricade, Type Iii-a | linear foot | $17.55 | $15.17 – $25.00 | 17 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| Saw cut for roadway loop detector and seal | linear foot | $15.00 | $13.50 – $23.00 | 17 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Signal Cable, Roadway Loop, Copper, 1C/14 Gauge | linear foot | $3.00 | $2.00 – $7.00 | 17 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Signal Cable, Detector Lead-in, Copper, 2C/16 Gauge | linear foot | $5.00 | $2.05 – $8.00 | 17 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Signal Detector Housing | each | $2,500 | $2,175 – $2,700 | 15 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Law Enforcement Officer | hour | $60.00 | $60.00 – $60.00 | 15 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| Conduit, Hdpe, 2 IN. Schedule 80 | linear foot | $32.00 | $24.25 – $39.00 | 14 | Sep 2, 2026, Sep 2, 2026 letting ↗ |
| Electrician | hour | $400.00 | $363.75 – $450.00 | 14 | Jul 8, 2026, Jul 8, 2026 letting ↗ |
| Asphalt for Tack Coat | ton | $630.00 | $295.00 – $725.87 | 13 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| Anchor Bolt Repair | each | $500.00 | $400.00 – $550.00 | 13 | Apr 8, 2026, Apr 8, 2026 letting ↗ |
| Hot mix asphalt wedge and level, type c | ton | $295.00 | $250.00 – $330.00 | 13 | Aug 5, 2026, Aug 5, 2026 letting ↗ |
| Luminaire, High Lumen Roadway | each | $650.00 | $484.75 – $750.00 | 12 | Apr 8, 2026, Apr 8, 2026 letting ↗ |
| Hot mix asphalt patch full deep, type c | ton | $345.00 | $293.75 – $426.25 | 12 | Sep 2, 2026, Sep 2, 2026 letting ↗ |