| Construction Sign, Type A | each | $187.50 | $139.05 – $232.00 | 40 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Construction Sign, Type B | each | $98.00 | $78.75 – $112.00 | 32 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Barricade, Type Iii-a | linear foot | $17.00 | $14.00 – $20.00 | 29 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Temporary Pavement Marking, Removable, 4 IN. | linear foot | $1.45 | $1.27 – $1.58 | 27 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Road Closure Sign Assembly | each | $280.00 | $235.00 – $395.00 | 25 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Construction Sign, a | each | $221.65 | $190.00 – $305.00 | 25 | May 10, 2023, May 10, 2023 letting ↗ |
| Signal Cable, Control, Copper, 5C/14 Gauge | linear foot | $4.00 | $3.50 – $5.00 | 25 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Pedestrian Push Button, Aps | each | $1,300 | $1,130 – $1,530 | 23 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Bridge deck patch, partial deep | square foot | $1.00 | $1.00 – $4.00 | 22 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Temporary Traffic Barrier, Type 2 | linear foot | $44.98 | $26.94 – $65.48 | 22 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Signal Cable, Roadway Loop, Copper, 1C/14 Gauge | linear foot | $1.00 | $0.762 – $1.50 | 22 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| Flashing Arrow Sign | day | $18.00 | $14.00 – $30.00 | 21 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Saw cut for roadway loop detector and seal | linear foot | $15.00 | $12.00 – $21.30 | 21 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| Pipe, Remove | linear foot | $39.39 | $25.00 – $70.00 | 21 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Conduit, Steel, Galvanized, 2 IN. | linear foot | $46.00 | $32.30 – $59.26 | 21 | Dec 10, 2025, Dec 10, 2025 letting ↗ |
| Line, Thermoplastic, Solid, Yellow, 4 IN. | linear foot | $0.94 | $0.75 – $1.26 | 21 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Joint Adhesive, Surface | linear foot | $1.00 | $0.5 – $1.47 | 20 | Mar 12, 2025, Mar 12, 2025 letting ↗ |
| Guardrail, MGS W-beam, 6 FT 3 IN. Spacing | linear foot | $25.00 | $23.90 – $28.12 | 20 | Dec 10, 2025, Dec 10, 2025 letting ↗ |
| Detour Route Marker Assembly | each | $104.00 | $78.75 – $226.50 | 20 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Signal Detector Housing | each | $1,975 | $1,350 – $2,344 | 20 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| Sign, Sheet, With Legend, 0.080 IN. | square foot | $35.10 | $30.00 – $49.00 | 20 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Inlet, Remove | each | $778.79 | $664.96 – $928.32 | 20 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Snowplowable Raised Pavement Marker | each | $55.00 | $37.25 – $82.25 | 20 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Riprap, Revetment | ton | $90.00 | $66.84 – $135.00 | 19 | Feb 11, 2026, Feb 11, 2026 letting ↗ |
| Pipe, Type 2, Circular, Diameter 12 IN. | linear foot | $90.00 | $75.00 – $130.37 | 18 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Joint Adhesive, Intermediate | linear foot | $0.89 | $0.502 – $1.21 | 18 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| Curb, Concrete | linear foot | $68.32 | $43.70 – $137.50 | 18 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Portable Changeable Message Sign | each | $4,675 | $3,500 – $6,500 | 17 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Line, Remove | linear foot | $0.78 | $0.6 – $1.05 | 17 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Temporary Pavement Marking, Removable, 6 IN. | linear foot | $2.25 | $2.00 – $2.95 | 17 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Energy Absorbing Terminal, Cz, TL-3 | each | $6,902 | $5,999 – $10,120 | 16 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Sign Post, Square, Type 1, Reinforced Anchor Base | linear foot | $35.75 | $30.00 – $40.05 | 16 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Truck Mounted Attenuator | day | $1,200 | $575.00 – $1,681 | 16 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Computer System Equipment | each | $1,085 | $919.81 – $1,672 | 15 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Grooving for pavement marking | linear foot | $0.75 | $0.445 – $0.95 | 15 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Transverse Marking, Thermoplastic, Stop Line, White, 24 IN. | linear foot | $10.25 | $9.61 – $13.61 | 15 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Guardrail, Remove | linear foot | $5.00 | $4.25 – $8.05 | 14 | Dec 10, 2025, Dec 10, 2025 letting ↗ |
| Sign, Sheet, With Legend, 0.100 IN. | square foot | $34.50 | $32.00 – $45.24 | 14 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| Curb AND Gutter, Concrete | linear foot | $43.86 | $31.69 – $59.50 | 14 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Casting, Manhole, Adjust to Grade | each | $1,083 | $787.30 – $1,324 | 14 | Feb 11, 2026, Feb 11, 2026 letting ↗ |
| Casting, Inlet, Adjust to Grade | each | $1,033 | $718.75 – $1,142 | 14 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| D-1 Contraction Joint | linear foot | $20.00 | $16.00 – $35.59 | 13 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Law Enforcement Officer | hour | $60.00 | $60.00 – $60.00 | 13 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Compaction aggregate no. 53 | ton | $50.95 | $46.69 – $75.81 | 12 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Field Drilled Hole in Concrete | each | $22.00 | $18.14 – $46.49 | 12 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Reinforced bars, epoxy coated | pound | $1.54 | $1.50 – $1.89 | 12 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Transverse Marking, Thermoplastic, Crosswalk Line, White, 24 IN. | linear foot | $10.25 | $9.78 – $12.48 | 12 | Feb 26, 2025, Feb 26, 2025 letting ↗ |