Paving · awarded bid prices
Hot mix asphalt surface remove butt joint: cost per square yard in Illinois
Listed by the agency as “Hma Surf Rem Butt Jt”.
The median awarded price is $17.87 per square yard, from 844 winning bids on 844 public projects in Illinois (2023–2026). Half of the awarded prices fall between $7.49 and $29.16.
Cost by state › Illinois › Hma Surf Rem Butt Jt
Winning bids only, as printed in the agencies' bid tabulations (DeKalb County Highway Department, IDOT, Tazewell County Highway Department, Winnebago County Highway Department). These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $10.20 in 2021 to $19.25 in 2026 (+89%).
| Year | Median per square yard | Winning bids |
|---|---|---|
| 2021 | $10.20 | 238 |
| 2022 | $12.35 | 236 |
| 2023 | $16.00 | 255 |
| 2024 | $18.75 | 264 |
| 2025 | $15.00 | 260 |
| 2026 | $19.25 | 281 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 18, 2026 | IDOT | 931 SQ YD | $0.01 | Open bid tab, 62V55 ↗ |
| Sep 18, 2026 | IDOT | 1185 SQ YD | $12.00 | Open bid tab, 62V85 ↗ |
| Sep 18, 2026 | IDOT | 622 SQ YD | $1.00 | Open bid tab, 62W73 ↗ |
| Sep 18, 2026 | IDOT | 350 SQ YD | $25.00 | Open bid tab, 62X33 ↗ |
| Sep 18, 2026 | IDOT | 8376 SQ YD | $20.00 | Open bid tab, 64T43 ↗ |
See every awarded price for this item, in all states, on the Hma Surf Rem Butt Jt item page.
Related items in Illinois
- Long Joint Sealant: $3.40 per linear foot
- Sidewalk Rem: $3.15 per square foot
- Pavement Rem: $20.00 per square yard
- Comb Curb Gutter Rem: $12.23 per linear foot
- Drive Pavement Rem: $20.00 per square yard
- Temp Conc Barrier: $35.00 per linear foot
- Pc Conc Sidewalk 5: $11.00 per square foot
- Rel Temp Conc Barrier: $9.00 per linear foot
Free account: new awarded prices for this item show on your watchlist.