| Flagger, Sussex County | hour | $78.00 | $68.75 – $83.26 | 30 | Oct 13, 2026, contract T201769009 ↗ |
| Flagger, Sussex County, Overtime | hour | $90.00 | $78.75 – $97.12 | 28 | Oct 13, 2026, contract T201769009 ↗ |
| Saw cutting, asphalt concrete | linear foot | $2.35 | $1.81 – $3.62 | 26 | Oct 13, 2026, contract T201769009 ↗ |
| Reinforced concrete pipe, 15 inch, class iv | linear foot | $75.00 | $57.00 – $87.00 | 25 | Oct 13, 2026, contract T201769009 ↗ |
| Preformed retroreflective thermoplastic marking, bike symbol | each | $420.00 | $400.00 – $450.00 | 25 | Feb 10, 2026, contract T201412701 ↗ |
| Erosion control blanket mulching | square yard | $3.00 | $2.75 – $5.00 | 23 | Oct 13, 2026, contract T201769009 ↗ |
| Borrow, Type F | cubic yard | $23.00 | $7.75 – $36.25 | 23 | Aug 11, 2026, contract T202606301 ↗ |
| Remove of pavement stripe | square foot | $3.00 | $1.77 – $5.67 | 23 | Feb 10, 2026, contract T201412701 ↗ |
| Excavation AND Embankment | cubic yard | $37.50 | $18.62 – $58.67 | 22 | Oct 13, 2026, contract T201769009 ↗ |
| Undercut Excavation | cubic yard | $26.50 | $20.50 – $33.44 | 22 | Oct 13, 2026, contract T201769009 ↗ |
| Remove of portland cement concrete pavement, curb and sidewalk | square yard | $37.50 | $22.00 – $48.75 | 22 | Oct 13, 2026, contract T201769009 ↗ |
| Riprap, R-4 | square yard | $85.50 | $57.38 – $100.00 | 22 | Oct 13, 2026, contract T201769009 ↗ |
| Saw cutting, concrete, full deep | linear foot | $5.92 | $4.01 – $10.56 | 22 | Oct 13, 2026, contract T201769009 ↗ |
| Drainage inlet, 34 inch x 24 inch | each | $3,960 | $3,661 – $4,084 | 22 | Sep 1, 2026, contract T202201701 ↗ |
| Gabc | ton | $85.24 | $66.25 – $123.19 | 22 | Aug 11, 2026, contract T202606301 ↗ |
| Pedestrian Connection, Type 1 | square foot | $27.00 | $22.00 – $35.75 | 22 | Aug 11, 2026, contract T202606301 ↗ |
| Superpave type b, pg 64- 22, patch | ton | $157.00 | $136.11 – $185.00 | 21 | Oct 13, 2026, contract T201769009 ↗ |
| Reinforced concrete pipe, 18 inch, class iv | linear foot | $76.00 | $65.00 – $88.00 | 21 | Oct 13, 2026, contract T201769009 ↗ |
| Pedestrian Connection, Type 2, 3, And/or 4 | square foot | $25.00 | $22.00 – $37.00 | 21 | Jun 16, 2026, contract T202401304 ↗ |
| Install or remove of traffic sign on multiple sign post | square foot | $14.00 | $13.39 – $15.65 | 21 | Feb 10, 2026, contract T201412701 ↗ |
| Gabc | cubic yard | $99.88 | $83.00 – $119.50 | 20 | Oct 13, 2026, contract T201769009 ↗ |
| Reinforced concrete flared end section, 15 inch | each | $1,150 | $989.83 – $1,462 | 20 | Oct 13, 2026, contract T201769009 ↗ |
| Galvanized Steel Beam Guardrail, Type 1-31 | linear foot | $42.00 | $38.06 – $55.62 | 20 | Oct 13, 2026, contract T201769009 ↗ |
| Conduit junction well, type 1, 20 inch x 20 inch precast concrete | each | $1,400 | $1,259 – $1,521 | 20 | Oct 13, 2026, contract T201769009 ↗ |
| Adjusting AND Repairing Existing Manhole | each | $1,142 | $976.25 – $1,394 | 20 | Jul 15, 2025, contract T201609601 ↗ |
| Permanent Grass Seeding, Dry Ground | square yard | $1.02 | $1.00 – $1.50 | 20 | Aug 11, 2026, contract T202606301 ↗ |
| Permanent pavement stripe, epoxy resin paint, white/yellow, 6 inch | linear foot | $1.00 | $0.75 – $2.19 | 19 | Feb 10, 2026, contract T201412701 ↗ |
| Adjusting and Repairing Existing Drainage Inlet | each | $1,275 | $1,136 – $1,962 | 18 | Oct 13, 2026, contract T201769009 ↗ |
| P.c.c. sidewalk, 6 inch | square foot | $14.00 | $13.00 – $16.12 | 18 | Oct 13, 2026, contract T201769009 ↗ |
| Geotextiles, Riprap | square yard | $5.00 | $4.06 – $7.13 | 18 | Oct 13, 2026, contract T201769009 ↗ |
| Topsoil, 6 inch deep | square yard | $9.00 | $5.81 – $13.75 | 18 | Oct 13, 2026, contract T201769009 ↗ |
| Inlet Sediment Control, Drainage Inlet | each | $250.00 | $150.00 – $350.00 | 17 | Oct 13, 2026, contract T201769009 ↗ |
| Temporary marking, paint, 4 inch | linear foot | $0.4 | $0.3 – $0.6 | 17 | Feb 10, 2026, contract T201412701 ↗ |
| Silt Fence | linear foot | $3.25 | $2.73 – $5.34 | 16 | Oct 13, 2026, contract T201769009 ↗ |
| Adjust Water Valve Boxes | each | $545.00 | $500.00 – $639.88 | 16 | Oct 13, 2026, contract T201769009 ↗ |
| Traffic Officers | hour | $110.00 | $110.00 – $180.00 | 16 | Oct 13, 2026, contract T201769009 ↗ |
| Permanent pavement stripe, symbol/legend alkyd-thermoplast ic | square foot | $6.30 | $5.11 – $7.31 | 16 | Feb 10, 2026, contract T201412701 ↗ |
| Compost Filter Logs | linear foot | $6.00 | $4.50 – $13.50 | 15 | Oct 13, 2026, contract T201769009 ↗ |
| P.c.c. sidewalk, 4 inch | square foot | $11.00 | $10.00 – $18.30 | 15 | Sep 1, 2026, contract T202201701 ↗ |
| Test Hole | cubic yard | $187.50 | $111.25 – $250.00 | 14 | Oct 13, 2026, contract T201769009 ↗ |
| Delaware NO. 3 Stone | ton | $72.50 | $62.75 – $76.50 | 14 | Sep 1, 2026, contract T202201701 ↗ |
| Topsoil | ton | $52.86 | $39.62 – $59.75 | 14 | Aug 11, 2026, contract T202606301 ↗ |
| Gabc, patch | cubic yard | $119.00 | $105.00 – $128.50 | 13 | Oct 13, 2026, contract T201769009 ↗ |
| Superpave Type B, PG 64-22 | ton | $127.00 | $115.00 – $182.00 | 13 | Oct 13, 2026, contract T201769009 ↗ |
| Provide and install loop wire 1-conductor #14 awg encased in 1/4 inch flexible tubing in a loop sawcut | linear foot | $19.11 | $18.60 – $20.70 | 13 | Sep 1, 2026, contract T202201701 ↗ |
| Superpave Type C, PG 64-22 (Carbonate Stone) | ton | $125.00 | $107.50 – $135.00 | 13 | Feb 10, 2026, contract T201412701 ↗ |
| Raised/Recessed Pavement Marker | each | $69.00 | $45.31 – $100.00 | 13 | Feb 10, 2026, contract T201412701 ↗ |
| Delaware NO. 57 Stone | ton | $71.50 | $70.00 – $80.50 | 12 | Oct 13, 2026, contract T201769009 ↗ |
| Install or remove of traffic sign(s) on single sign post | each | $73.75 | $68.78 – $81.88 | 12 | Feb 10, 2026, contract T201412701 ↗ |
| Galvanized telescoping steel sign post, 12' x 2 inch, complete w/ baseposts and hardware | each | $228.38 | $173.25 – $263.75 | 12 | Feb 10, 2026, contract T201412701 ↗ |
| Superpave type c, pg 64- 22, patch | ton | $178.00 | $146.81 – $217.75 | 12 | Feb 10, 2026, contract T201412701 ↗ |
| Supply OF Flat Sheet Aluminum Sign Panel, Type IV, Retroreflective Sheeting | square foot | $22.75 | $12.99 – $24.36 | 12 | Feb 10, 2026, contract T201412701 ↗ |
| Temporary marking, paint symbol/legend | square foot | $2.12 | $1.70 – $2.26 | 12 | Feb 10, 2026, contract T201412701 ↗ |