| Saw cutting, asphalt concrete | linear foot | $1.50 | $1.00 – $2.59 | 71 | Oct 13, 2026, contract T202120003 ↗ |
| Flagger, NEW Castle County | hour | $59.00 | $32.00 – $85.00 | 69 | Oct 13, 2026, contract T202120003 ↗ |
| Gabc | cubic yard | $60.00 | $38.50 – $75.00 | 66 | Oct 13, 2026, contract T202120003 ↗ |
| Flagger, NEW Castle County, Overtime | hour | $79.75 | $35.00 – $99.00 | 65 | Oct 13, 2026, contract T202120003 ↗ |
| Superpave type b, pg 64- 22, patch | ton | $105.00 | $60.00 – $150.00 | 63 | Oct 13, 2026, contract T202120003 ↗ |
| Saw cutting, concrete, full deep | linear foot | $4.00 | $3.75 – $5.00 | 63 | Oct 13, 2026, contract T202120003 ↗ |
| Remove of portland cement concrete pavement, curb and sidewalk | square yard | $25.00 | $18.00 – $35.00 | 61 | Oct 13, 2026, contract T202120003 ↗ |
| Inlet Sediment Control, Drainage Inlet | each | $125.00 | $68.00 – $180.00 | 61 | Aug 18, 2026, contract T202611302 ↗ |
| P.c.c. sidewalk, 4 inch | square foot | $9.80 | $4.00 – $12.50 | 60 | Oct 13, 2026, contract T202120003 ↗ |
| Adjusting and Repairing Existing Drainage Inlet | each | $1,000 | $1,000 – $1,250 | 57 | Oct 13, 2026, contract T202120003 ↗ |
| Erosion control blanket mulching | square yard | $3.00 | $3.00 – $4.00 | 57 | Jul 28, 2026, contract T202501101 ↗ |
| P.c.c. sidewalk, 6 inch | square foot | $11.00 | $7.50 – $15.07 | 55 | Oct 13, 2026, contract T202120003 ↗ |
| Adjusting AND Repairing Existing Manhole | each | $700.00 | $500.00 – $850.00 | 52 | Oct 13, 2026, contract T202120003 ↗ |
| Pedestrian Connection, Type 1 | square foot | $17.60 | $14.00 – $23.75 | 50 | Jun 16, 2026, contract T202606104 ↗ |
| PCC Curb, Type 1-8 | linear foot | $40.00 | $39.00 – $49.23 | 49 | Jul 28, 2026, contract T202501101 ↗ |
| Pedestrian Connection, Type 2, 3, And/or 4 | square foot | $17.50 | $15.00 – $23.00 | 49 | Jun 16, 2026, contract T202606104 ↗ |
| Permanent Grass Seeding, Subdivision | square yard | $1.06 | $1.00 – $2.10 | 47 | Oct 13, 2026, contract T202120003 ↗ |
| Drainage Inlet Grate(s) | each | $350.00 | $317.75 – $400.00 | 46 | Oct 13, 2026, contract T202120003 ↗ |
| Install or remove of traffic sign(s) on single sign post | each | $100.00 | $81.25 – $250.00 | 46 | Mar 3, 2026, contract T202220003 ↗ |
| Drainage Inlet Frame(s) | each | $350.00 | $303.75 – $400.00 | 44 | Oct 13, 2026, contract T202120003 ↗ |
| Superpave type c, pg 64- 22, patch | ton | $118.00 | $95.00 – $155.25 | 43 | Mar 3, 2026, contract T202220003 ↗ |
| Permanent pavement stripe, symbol/legend alkyd-thermoplast ic | square foot | $8.90 | $5.37 – $13.78 | 42 | Mar 3, 2026, contract T202220003 ↗ |
| Adjusting AND Repairing Existing Double Drainage Inlet | each | $1,500 | $1,500 – $1,885 | 42 | Jul 28, 2026, contract T202501101 ↗ |
| I.pcc Curb AND Gutter, Type 2 | linear foot | $42.20 | $39.00 – $45.00 | 41 | Jul 28, 2026, contract T202501101 ↗ |
| Topsoil | ton | $40.00 | $30.00 – $44.38 | 39 | Mar 31, 2026, contract T202603120 ↗ |
| Topsoil, 6 inch deep | square yard | $12.00 | $8.00 – $13.50 | 35 | Oct 13, 2026, contract T202120003 ↗ |
| I.pcc Curb AND Gutter, Type 1-8 | linear foot | $40.38 | $40.00 – $49.50 | 34 | Jul 28, 2026, contract T202501101 ↗ |
| Speed Hump | linear foot | $109.00 | $105.00 – $141.25 | 34 | Mar 31, 2026, contract T202603120 ↗ |
| Steel casing pipe, 4 inch | linear foot | $10.00 | $5.00 – $10.00 | 34 | Mar 31, 2026, contract T202603120 ↗ |
| Truncated Dome Detectable Warning Surface | square foot | $32.00 | $30.00 – $33.85 | 32 | Oct 13, 2026, contract T202120003 ↗ |
| Superpave Type C, PG 64-22 (Carbonate Stone) | ton | $111.00 | $103.75 – $120.00 | 32 | Jan 20, 2026, contract T201407106 ↗ |
| Traffic Officers | hour | $180.00 | $110.00 – $180.00 | 31 | Oct 13, 2026, contract T202120003 ↗ |
| Manhole Cover(s) | each | $350.00 | $302.50 – $400.00 | 31 | Oct 13, 2026, contract T202120003 ↗ |
| Manhole Frame(s) | each | $350.00 | $300.00 – $400.00 | 31 | Oct 13, 2026, contract T202120003 ↗ |
| Silt Fence | linear foot | $4.00 | $3.00 – $5.00 | 28 | Jul 28, 2026, contract T202501101 ↗ |
| Temporary marking, paint symbol/legend | square foot | $5.00 | $2.50 – $9.50 | 27 | Oct 7, 2025, contract T202406101 ↗ |
| Detectable Warning Surface | square foot | $35.00 | $32.00 – $49.00 | 25 | Mar 3, 2026, contract T202220003 ↗ |
| I.pcc Curb AND Gutter, Type 3-8 | linear foot | $49.23 | $40.00 – $50.00 | 25 | Jul 28, 2026, contract T202501101 ↗ |
| Temporary marking, paint, 4 inch | linear foot | $1.10 | $0.75 – $2.50 | 25 | Oct 7, 2025, contract T202406101 ↗ |
| Asphalt crack and joint seal less than 3/4-inch wide | linear foot | $1.65 | $1.00 – $2.00 | 24 | May 19, 2026, contract T202606103 ↗ |
| Install or remove of traffic sign on multiple sign post | square foot | $21.00 | $15.00 – $31.62 | 24 | Dec 9, 2025, contract T202201102 ↗ |
| Reinforced concrete pipe, 15 inch, class iv | linear foot | $75.00 | $65.00 – $85.50 | 23 | Jul 28, 2026, contract T202501101 ↗ |
| PCC Curb, Type 2 | linear foot | $42.20 | $40.00 – $50.50 | 23 | Oct 13, 2026, contract T202120003 ↗ |
| Compost Filter Logs | linear foot | $10.00 | $6.50 – $15.00 | 23 | Jul 28, 2026, contract T202501101 ↗ |
| Borrow, Type F | cubic yard | $36.00 | $10.00 – $45.00 | 23 | Oct 13, 2026, contract T202120003 ↗ |
| Delaware NO. 57 Stone | ton | $76.00 | $62.00 – $89.00 | 21 | Jun 30, 2026, contract T201907103 ↗ |
| Superpave Type B, PG 64-22 | ton | $115.00 | $98.50 – $155.00 | 21 | Oct 13, 2026, contract T202120003 ↗ |
| Galvanized Steel Beam Guardrail, Type 1-31 | linear foot | $40.00 | $36.00 – $43.00 | 21 | Dec 16, 2025, contract T201907102 ↗ |
| Install of 4 inch diameter hole, less than or equal to 6 inch deep | each | $150.00 | $120.00 – $210.00 | 21 | Oct 13, 2026, contract T202120003 ↗ |
| Conduit junction well, type 4, 20 inch x 42-1/2 inch precast concrete | each | $1,900 | $1,800 – $2,128 | 21 | Oct 13, 2026, contract T202120003 ↗ |
| Provide and install loop wire 1-conductor #14 awg encased in 1/4 inch flexible tubing in a loop sawcut | linear foot | $19.00 | $18.00 – $22.50 | 21 | Oct 13, 2026, contract T202120003 ↗ |
| Superpave Type C, PG 76-22 (non-carbonate Stone) | ton | $120.00 | $107.00 – $136.00 | 21 | Dec 9, 2025, contract T202201102 ↗ |
| Raised/Recessed Pavement Marker | each | $46.00 | $36.50 – $67.00 | 21 | Oct 7, 2025, contract T202406101 ↗ |
| Install or remove traffic sign | each | $79.50 | $75.00 – $98.50 | 20 | Oct 13, 2026, contract T202120003 ↗ |
| Remove of guardrail and fence | linear foot | $4.25 | $2.50 – $8.95 | 20 | Aug 18, 2026, contract T202611302 ↗ |
| Guardrail END Treatment, Type 1-31, Test Level 3 | each | $4,275 | $3,792 – $4,500 | 20 | Dec 16, 2025, contract T201907102 ↗ |
| Channel Bed Fill | cubic yard | $139.50 | $103.75 – $194.50 | 20 | Jun 30, 2026, contract T201907103 ↗ |
| Pipe, culvert, and structure excavation | cubic yard | $35.00 | $28.00 – $70.00 | 20 | Oct 1, 2024, contract T200707404 ↗ |
| Structure backfill, (borrow type c) | cubic yard | $35.00 | $30.38 – $40.25 | 20 | Jan 20, 2026, contract T201407106 ↗ |
| Borrow, Type C | cubic yard | $45.00 | $41.00 – $56.40 | 20 | Jan 20, 2026, contract T201407106 ↗ |
| Test Hole | cubic yard | $500.00 | $150.00 – $700.00 | 19 | Oct 13, 2026, contract T202120003 ↗ |
| Geotextiles, Riprap | square yard | $6.00 | $4.00 – $6.88 | 19 | Jul 28, 2026, contract T202501101 ↗ |
| Permanent Grass Seeding, Dry Ground | square yard | $1.70 | $1.25 – $2.75 | 19 | Aug 18, 2026, contract T202611302 ↗ |
| Supply OF Flat Sheet Aluminum Sign Panel, Type IV, Retroreflective Sheeting | square foot | $24.00 | $18.75 – $29.50 | 19 | Mar 3, 2026, contract T202220003 ↗ |
| Pcc pavement, 8 inch | square yard | $110.00 | $105.00 – $120.00 | 19 | May 6, 2025, contract T202503107 ↗ |
| Delaware NO. 3 Stone | ton | $65.50 | $55.00 – $97.00 | 18 | Jun 30, 2026, contract T201907103 ↗ |
| Drainage inlet, 34 inch x 24 inch | each | $3,920 | $2,835 – $5,288 | 18 | Mar 10, 2026, contract T202604906 ↗ |
| Galvanized telescoping steel sign post, 12' x 2 inch, complete w/ baseposts and hardware | each | $200.00 | $160.00 – $250.00 | 17 | Aug 18, 2026, contract T202611302 ↗ |
| Adjust AND Repair Existing Sanitary Manhole | each | $1,060 | $800.00 – $1,268 | 16 | Oct 13, 2026, contract T202120003 ↗ |
| Conduit junction well, type 1, 20 inch x 20 inch precast concrete | each | $1,452 | $1,396 – $1,621 | 16 | Oct 13, 2026, contract T202120003 ↗ |
| Inlet Sediment Control, Curb Inlet | each | $160.00 | $150.50 – $200.00 | 15 | Oct 13, 2026, contract T202120003 ↗ |
| Adjust or Repair Existing Conduit Junction Well | each | $410.00 | $380.00 – $495.00 | 15 | Jul 28, 2026, contract T202501101 ↗ |
| PCC Curb, Type 1-4 | linear foot | $43.00 | $38.00 – $50.00 | 14 | Oct 13, 2026, contract T202120003 ↗ |
| PCC Curb, Type 1-6 | linear foot | $50.00 | $39.25 – $65.25 | 14 | Oct 13, 2026, contract T202120003 ↗ |
| Adjust GAS Valve Boxes | each | $600.00 | $468.75 – $698.75 | 14 | Oct 13, 2026, contract T202120003 ↗ |
| Stabilized Construction Entrance | square yard | $36.30 | $27.50 – $65.00 | 13 | Jun 30, 2026, contract T201907103 ↗ |
| Pole Base, Type 4A | each | $875.00 | $585.00 – $915.00 | 13 | Oct 13, 2026, contract T202120003 ↗ |
| Sump PIT | each | $2,000 | $1,400 – $3,500 | 13 | Jun 30, 2026, contract T201907103 ↗ |
| Preformed retroreflective thermoplastic marking, bike symbol | each | $487.50 | $421.25 – $525.00 | 12 | Mar 3, 2026, contract T202220003 ↗ |
| Supply OF Flat Sheet Aluminum Sign Panel, Type XI, Retroreflective Sheeting | square foot | $25.25 | $23.44 – $28.25 | 12 | Mar 3, 2026, contract T202220003 ↗ |