Sediment Control System at Catch Basin ** See Special Provisions **: cost per each in Hartford County, CT

The median awarded price is $150.00 per each, from 17 winning bids on 17 public projects in Hartford County, CT (2024–2026). Half of the awarded prices fall between $115.00 and $275.00.

Cost by state › Connecticut › Hartford County › Sediment Control System at Catch Basin ** See Special Provisions **

$150.00median per each
$115.00 – $275.00middle half (25th–75th percentile)
17winning bids, 17 source documents
2024–2026lettings covered (last 3 years)

Winning bids only, as printed in the agencies' bid tabulations (CTDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.

Trend

The median awarded price went from $148.50 in 2025 to $140.00 in 2026 (-6%).

YearMedian per eachWinning bids
2025$148.508
2026$140.008

Most recent source documents

LettingAgencyQuantityAwarded unit priceSource
Jul 29, 2026CTDOT55 ea.$92.50line 0350 ↗
Jul 29, 2026CTDOT31 ea.$130.00line 0350 ↗
Jul 22, 2026CTDOT5 ea.$250.00line 0120 ↗
Jul 1, 2026CTDOT6 ea.$100.00line 0120 ↗
Apr 29, 2026CTDOT12 ea.$150.00line 0100 ↗

See every awarded price for this item on the Sediment Control System at Catch Basin ** See Special Provisions ** item page.