| Traffic Control | ls | 28 | — | $800.00 | $800.00 – $107,000 | Aug 7, 2026, Open bid tab, 2610 ↗ |
| Mobilization | ls | 25 | $81,157 | $28,745 | $2,500 – $1,090,000 | Aug 7, 2026, Open bid tab, 2610 ↗ |
| Silt Fence, Type MS | linear foot | 16 | $2.00 | $3.25 | $1.75 – $4.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Seeding | acre | 16 | $292.50 | $230.00 | $100.00 – $6,000 | May 21, 2026, Open bid tab, 2605 ↗ |
| Excavation - Subgrade (P) | cubic yard | 14 | $13.50 | $15.00 | $3.00 – $23.50 | May 21, 2026, Open bid tab, 2605 ↗ |
| Common Embankment (Cv) (P) | cubic yard | 14 | $9.50 | $15.00 | $2.00 – $15.50 | May 21, 2026, Open bid tab, 2605 ↗ |
| Excavation Common **P** | cubic yard | 14 | $11.50 | $15.00 | $2.00 – $22.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| 6 inch solid line paint | linear foot | 13 | $0.15 | $1.00 | $0.09 – $1.25 | Aug 26, 2025, Open bid tab, 2505 ↗ |
| Remove pipe culvert | linear foot | 13 | $18.50 | $43.86 | $10.00 – $43.86 | Aug 7, 2026, Open bid tab, 2610 ↗ |
| Sawing bit pavement (full deep) | linear foot | 13 | $3.50 | $2.75 | $0.01 – $10.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Truncated Domes | square foot | 13 | $65.00 | $55.00 | $50.00 – $135.36 | May 21, 2026, Open bid tab, 2605 ↗ |
| Salvage Mail Box Support | each | 12 | $137.50 | $165.00 | $45.50 – $250.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Install Mail Box Support | each | 12 | $200.00 | $385.00 | $50.50 – $385.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Culvert End Controls | each | 12 | $182.50 | $200.00 | $85.00 – $354.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Fertilizer Type 3 | pound | 12 | $1.00 | $1.00 | $0.49 – $1.55 | May 21, 2026, Open bid tab, 2605 ↗ |
| Casting Assembly | each | 12 | $810.50 | $725.00 | $499.00 – $1,120 | May 21, 2026, Open bid tab, 2605 ↗ |
| Remove asphalt pavement | square yard | 12 | $3.75 | $3.00 | $2.50 – $8.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Storm Drain Inlet Protection | each | 12 | $160.00 | $150.00 | $120.00 – $350.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| 15 inch rc pipe apron | each | 11 | $1,250 | $1,770 | $450.00 – $1,770 | May 21, 2026, Open bid tab, 2606 ↗ |
| Select Granular Embankment (Cv) (P) | cubic yard | 11 | $16.00 | $23.00 | $7.55 – $23.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Pavement mssg paint | square foot | 10 | $3.65 | $15.00 | $2.50 – $15.00 | May 8, 2024, Open bid tab, 2404 ↗ |
| Stabilized Construction Exit | ls | 10 | — | $1.00 | $1.00 – $15,000 | May 21, 2026, Open bid tab, 2605 ↗ |
| 6 inch concrete walk | square foot | 10 | $9.50 | $9.00 | $7.25 – $15.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Remove Sign | each | 10 | $28.50 | $27.00 | $25.00 – $94.16 | May 21, 2026, Open bid tab, 2605 ↗ |
| Fertilizer Type 4 | pound | 9 | $1.75 | $2.50 | $1.00 – $2.50 | May 21, 2026, Open bid tab, 2605 ↗ |
| Remove Pipe Apron | each | 9 | $410.50 | $415.00 | $190.00 – $900.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Rapid Stabilization Method 4 | square yard | 9 | $2.00 | $2.25 | $1.45 – $2.50 | May 21, 2026, Open bid tab, 2605 ↗ |
| Geotextile Filter Type 4 | square yard | 9 | $5.00 | $12.50 | $3.50 – $12.50 | May 21, 2026, Open bid tab, 2606 ↗ |
| Delineator / Marker Panel | each | 9 | $98.00 | $104.00 | $70.00 – $125.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Equipment Pad B | each | 9 | $1,290 | $1,220 | $740.00 – $2,425 | May 7, 2026, Open bid tab, 2607 ↗ |
| Service Cabinet -type L1 | each | 9 | $12,500 | $15,800 | $5,550 – $15,800 | May 7, 2026, Open bid tab, 2607 ↗ |
| Light Foundation Design E | each | 9 | $1,350 | $1,100 | $1,010 – $2,000 | May 7, 2026, Open bid tab, 2607 ↗ |
| Pavement marking remove | linear foot | 9 | $0.9 | $1.00 | $0.5 – $2.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| Aggregate Surfacing Class 5 | ton | 9 | $35.00 | $35.00 | $30.00 – $35.00 | May 12, 2022, Open bid tab, 2204 ↗ |
| Sediment Control Log Type Wood Fiber | linear foot | 9 | $3.25 | $6.70 | $2.45 – $6.70 | May 7, 2026, Open bid tab, 2607 ↗ |
| Interim Pavement Marking | linear foot | 9 | $0.44 | $0.48 | $0.4 – $0.6 | Mar 7, 2023, Open bid tab, 23-02 ↗ |
| 24 inch solid line paint | linear foot | 9 | $3.00 | $2.80 | $2.80 – $3.00 | May 12, 2022, Open bid tab, 2204 ↗ |
| 6 inch concrete driveway pavement | square yard | 9 | $80.00 | $112.00 | $63.60 – $112.00 | May 21, 2026, Open bid tab, 2605 ↗ |
| 4 inch concrete walk | square foot | 9 | $5.65 | $7.50 | $4.40 – $7.50 | May 21, 2026, Open bid tab, 2605 ↗ |
| Sign | square foot | 9 | $73.00 | $63.00 | $63.00 – $100.00 | May 21, 2026, Open bid tab, 2605 ↗ |