Skip to content
Hubstake

Agency · awarded bid prices

Wadena County: awarded unit prices

134 winning bid prices read from 10 source documents, 2024–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Wadena County

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Aggregate Surfacing Class 1ton8$20.00$11.30$10.75 – $22.00Mar 31, 2026, Open bid tab, 4026 ↗
Traffic Controlls8$6,500$6,000$2,000 – $20,000Mar 18, 2026, Open bid tab, 1813 ↗
Mobilizationls8$43,400$60,000$2,000 – $80,000Mar 18, 2026, Open bid tab, 1813 ↗
6 inch solid line multi complinear foot5$0.45$0.44$0.42 – $0.61Mar 18, 2026, Open bid tab, 1813 ↗
Milled Rumble Stripseach4—$265.00$265.00 – $750.00Mar 18, 2026, Open bid tab, 1813 ↗
4 inch broken line multi complinear foot4—$0.4$0.39 – $0.46Mar 18, 2026, Open bid tab, 1813 ↗
Type Sp 9.5 Wearing Course Mix (2,B)ton4—$57.00$54.00 – $94.00Mar 18, 2026, Open bid tab, 1813 ↗
4 inch solid line multi complinear foot4—$0.4$0.39 – $0.46Mar 18, 2026, Open bid tab, 1813 ↗
Pavement mssg multi compsquare foot3—$27.00$24.00 – $27.00Mar 18, 2026, Open bid tab, 1813 ↗
24 inch solid line multi complinear foot3—$23.00$22.00 – $23.00Mar 18, 2026, Open bid tab, 1813 ↗
Type Sp 9.5 Wearing Course Mix (2,C)ton3—$65.00$64.00 – $75.00Mar 18, 2026, Open bid tab, 1813 ↗
Stabilized full deep reclamation (p)square yard2—$2.70$2.70 – $2.85Mar 18, 2026, Open bid tab, 1813 ↗
Rolled Erosion Prevention Category 20square yard2—$2.50$2.50Apr 18, 2024, Open bid tab, 2011 ↗
Flotation Silt Curtain Type Moving Waterlinear foot2—$27.50$16.95 – $27.50Apr 18, 2024, Open bid tab, 2011 ↗
Select Granular Embankment (Cv) (P)cubic yard2—$13.00$13.00 – $33.25Apr 18, 2024, Open bid tab, 2011 ↗
Excavation Common **P**cubic yard2—$13.75$13.75 – $17.00Apr 18, 2024, Open bid tab, 2011 ↗
Milling asphalt surface (2.0 inch)square yard2—$0.96$0.96 – $1.00Mar 17, 2026, Open bid tab, 2323 ↗
Silt Fence, Type MSlinear foot2—$0.55$0.55 – $3.00Apr 18, 2024, Open bid tab, 2011 ↗
Articulated Block MAT Closed Cell, Type Asquare yard1—$83.00$83.00Apr 18, 2024, Open bid tab, 2011 ↗
18 inch cas pipe sewerlinear foot1—$47.00$47.00Apr 18, 2024, Open bid tab, 2011 ↗
Remove asphalt wearing coursesquare foot1—$1.60$1.60Apr 18, 2024, Open bid tab, 2011 ↗
Type sp 9.5 wearing course mix (2,c) 3.0 inch thicksquare yard1—$12.00$12.00Apr 18, 2024, Open bid tab, 2011 ↗
Culvert End Controlsls1—$2,000$2,000Apr 18, 2024, Open bid tab, 2011 ↗
Aggregate Base Class 5 (P)ton1—$45.00$45.00Apr 4, 2024, Open bid tab, 1007 ↗
Type s (tl-4) barrier concrete (3s52) (p)linear foot1—$140.00$140.00Apr 4, 2024, Open bid tab, 1007 ↗
C-i-p concrete test pile 85 ft long 12 incheach1—$16,000$16,000Apr 4, 2024, Open bid tab, 1007 ↗
Prestressed Concrete Beams 27M (P)linear foot1—$450.00$450.00Apr 4, 2024, Open bid tab, 1007 ↗
Random Riprap Class Vcubic yard1—$105.00$105.00Apr 4, 2024, Open bid tab, 1007 ↗
18 inch rc pipe sewerlinear foot1—$120.00$120.00Apr 18, 2024, Open bid tab, 2011 ↗
Elastomeric Bearing PAD Type 1each1—$200.00$200.00Apr 4, 2024, Open bid tab, 1007 ↗
Rolled Erosion Prevention Category 74square yard1—$13.95$13.95Apr 4, 2024, Open bid tab, 1007 ↗
Floor Drain Type B706 Modifiedeach1—$2,100$2,100Apr 4, 2024, Open bid tab, 1007 ↗
Rapid Stabilization Method 1acre1—$500.00$500.00Apr 4, 2024, Open bid tab, 1007 ↗
Concrete Drainage Flumesquare yard1—$420.00$420.00Apr 18, 2024, Open bid tab, 2011 ↗
Pile points 12 incheach1—$350.00$350.00Apr 4, 2024, Open bid tab, 1007 ↗
Structure steel (3306) (p)pound1—$7.00$7.00Apr 4, 2024, Open bid tab, 1007 ↗
Culvert Excavation Class U (P)cubic yard1—$1.00$1.00Apr 18, 2024, Open bid tab, 2011 ↗
Milling asphalt surface (1.5 inch) (p)square yard1—$1.00$1.00Mar 18, 2026, Open bid tab, 1813 ↗
C-i-p concrete piling 12 inchlinear foot1—$38.00$38.00Apr 4, 2024, Open bid tab, 1007 ↗
Slope Preparationls1—$8,000$8,000Apr 4, 2024, Open bid tab, 1007 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Minnesota: statewide figures.