| Rock Excavation | cubic yard | 6 | $177.50 | $100.00 | $100.00 – $412.00 | Nov 13, 2025, Open bid tab, bidtabmiawmi2501pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 5 | $10.00 | $8.00 | $8.00 – $111.00 | Feb 8, 2024, Open bid tab, bidtabmiawmi2206pdf ↗ |
| Valve Box Removed | each | 5 | $250.60 | $821.00 | $200.00 – $821.00 | Feb 8, 2024, Open bid tab, bidtabmiawmi2206pdf ↗ |
| 1 inch curb stop valve and valve box | each | 4 | — | $200.00 | $200.00 – $330.00 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 1 inch type k copper water service branch, as per plan | linear foot | 4 | — | $100.00 | $37.00 – $225.00 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| Removed, As Per Plan | ls | 4 | — | $6,500 | $6,500 – $50,000 | Nov 13, 2025, Open bid tab, bidtabmiawmi2501pdf ↗ |
| 10 inch pvc c-900 water main, as per plan | linear foot | 3 | — | $113.00 | $113.00 – $358.00 | Feb 8, 2024, Open bid tab, bidtabmiawmi2206pdf ↗ |
| 6 inch pvc c-900 water main, as per plan | linear foot | 3 | — | $129.00 | $129.00 – $324.00 | Feb 8, 2024, Open bid tab, bidtabmiawmi2206pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 3 | — | $65,000 | $2,775 – $65,000 | Nov 13, 2025, Open bid tab, bidtabmiawmi2501pdf ↗ |
| Maintaining Traffic | ls | 3 | — | $12,000 | $9,715 – $40,000 | Feb 8, 2024, Open bid tab, bidtabmiawmi2206pdf ↗ |
| 10 inch gate valve | each | 3 | — | $4,214 | $2,690 – $4,214 | Feb 8, 2024, Open bid tab, bidtabmiawmi2206pdf ↗ |
| 6 inch gate valve | each | 3 | — | $2,300 | $1,300 – $2,300 | Feb 8, 2024, Open bid tab, bidtabmiawmi2206pdf ↗ |
| Concrete Retaining Wall, In Kind | square foot | 2 | — | $200.00 | $200.00 – $205.00 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s1 ↗ |
| Private Underground Water Service Branch, As Per Plan | linear foot | 2 | — | $130.00 | $113.00 – $130.00 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s1 ↗ |
| Water Meter Pit, As Per Plan | each | 2 | — | $2,000 | $939.00 – $2,000 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s1 ↗ |
| Interior Private Water Service, As Per Plan | each | 2 | — | $1,500 | $380.00 – $1,500 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s1 ↗ |
| Concrete Steps In Kind | linear foot | 2 | — | $150.00 | $150.00 – $222.60 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s1 ↗ |
| Concrete Walk, In Kind | square foot | 2 | — | $20.00 | $20.00 – $100.60 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s1 ↗ |
| Fire Hydrant Removed And Reset | each | 2 | — | $6,000 | $3,378 – $6,000 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| Cut And Cap | each | 2 | — | $400.00 | $400.00 – $1,946 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| Cut And Plug, As Per Plan | each | 2 | — | $8,000 | $1,752 – $8,000 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 10 inch line stop, as per plan | each | 2 | — | $11,200 | $11,200 – $11,880 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 6 inch line stop, as per plan | each | 2 | — | $7,500 | $7,500 – $9,814 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 4 inch line stop, as per plan | each | 2 | — | $7,500 | $7,500 – $12,215 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 2 inch type k copper water service branch, as per plan | linear foot | 2 | — | $120.00 | $120.00 – $231.00 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 12 inch pvc c-900 water main, as per plan | linear foot | 2 | — | $240.00 | $198.00 – $240.00 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 4 inch pvc c-900 water main, as per plan | linear foot | 2 | — | $150.00 | $150.00 – $787.00 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| Detector Loop, As Per Plan | each | 2 | — | $2,500 | $975.00 – $2,500 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| Detour Signing, As Per Plan | each | 2 | — | $4,200 | $4,200 – $22,400 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| Sanitary Sewer Lateral Repair, As Per Plan | linear foot | 2 | — | $55.00 | $55.00 – $93.00 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 10 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $30.00 | $30.00 – $102.20 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 2 | — | $9,500 | $9,500 – $11,935 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 12 inchx12 inch tapping sleeve and valve | each | 2 | — | $2,100 | $2,100 – $9,208 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 12 inch gate valve | each | 2 | — | $4,000 | $3,245 – $4,000 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| Low Strength Mortar Backfill | cubic yard | 2 | — | $225.00 | $225.00 – $299.50 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $19.00 | $19.00 – $85.25 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $11.00 | $11.00 – $74.40 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $5.00 | $5.00 – $59.40 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |
| Mobilization | ls | 2 | — | $25,000 | $600.00 – $25,000 | Nov 13, 2025, Open bid tab, bidtabmiawmi2501pdf ↗ |
| 4 inch gate valve | each | 2 | — | $1,300 | $1,100 – $1,300 | May 23, 2023, Open bid tab, bidtabmiawmi1804pdf-s0 ↗ |