Village of West Jefferson: awarded unit prices

314 winning bid prices read from 7 source documents, 2022–2025. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of West Jefferson

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Maintaining Trafficls6—$5,000$1,500 – $65,800Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗
Removed, As Per Planls6$17,550$25,000$3,500 – $32,500Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard5$3.50$6.00$2.50 – $6.00Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗
8 inch conduit, type b, 707.45, storm repairlinear foot4—$40.00$18.00 – $48.00Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗
6 inch conduit, type b, 707.45, storm repairlinear foot4—$35.00$16.00 – $45.00Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗
4 inch conduit, type b, 707.45, storm repairlinear foot4—$30.00$15.00 – $40.00Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗
Stabilized Crushed Aggregatecubic yard4—$60.00$60.00 – $150.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Walk Removedsquare foot4—$5.00$2.00 – $5.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
12 inch conduit, type blinear foot3—$100.00$75.00 – $120.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
4 inch concrete walksquare foot3—$13.00$6.75 – $15.00Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗
Clearing And Grubbing, As Per Planls3—$1,000$1,000 – $5,000Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗
Stop Linelinear foot3—$9.00$9.00 – $10.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Valve Box Adjusted To Gradeeach3—$300.00$225.00 – $400.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Curb And Gutter Removedlinear foot3—$10.00$8.00 – $10.00Jun 25, 2024, Open bid tab, bidtabmadwje2203pdf ↗
Aggregate Basecubic yard3—$65.00$65.00 – $112.00Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗
Asphalt Concrete Intermediate Course, 12.5Mm, Type A (449)cubic yard2—$300.00$261.81 – $300.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Catch Basin, S125Aeach2—$3,200$3,200 – $8,500Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗
15 inch conduit, type blinear foot2—$120.00$100.00 – $120.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
18 inch conduit, type blinear foot2—$140.00$100.00 – $140.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
4 inch shallow pipe underdrains (perforated)linear foot2—$25.00$18.00 – $25.00Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗
Pavement Repair, As Per Plansquare yard2—$100.00$100.00 – $180.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Service Box Adjusted To Gradeeach2—$300.00$300.00 – $360.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Sign, Flat Sheetsquare foot2—$40.00$19.00 – $40.00Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗
8 inch conduit, type b, 707.45, storm repair, as per planlinear foot2—$25.00$25.00 – $30.00Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗
6 inch conduit, type b, 707.45, storm repair, as per planlinear foot2—$20.00$20.00 – $25.00Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗
4 inch conduit, type b, 707.45, storm repair, as per planlinear foot2—$15.00$15.00 – $20.00Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗
Construction Layout Stakes And Surveying, As Per Planls2—$1,500$1,500 – $5,000Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗
Valve Box Removedeach2—$100.00$10.00 – $100.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Curb Removedlinear foot2—$10.00$10.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
6 inch non-reinforced concrete pavementsquare yard2—$100.00$85.84 – $100.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Asphalt Concrete Base, Pg64-22cubic yard2—$220.00$200.00 – $220.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Channelizing line, 8 inchlinear foot2—$2.80$2.10 – $2.80May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Crosswalk Linelinear foot2—$4.30$4.30 – $5.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Ground Mounted Support, No. 3 Postlinear foot2—$38.00$25.00 – $38.00Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗
Manhole Adjusted To Gradeeach2—$1,000$1,000 – $1,200Jun 25, 2024, Open bid tab, bidtabmadwje2203pdf ↗
Combination Curb And Gutter, Type 2, As Per Planlinear foot2—$41.50$24.00 – $41.50Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗
Curb Ramp, As Per Plansquare foot2—$40.00$11.00 – $40.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Non-Tracking Tack Coat, 0.06 Gal/S.Y.gallon2—$3.00$3.00 – $5.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗
Aggregate Base, As Per Plancubic yard2—$50.00$50.00 – $85.00Jun 25, 2024, Open bid tab, bidtabmadwje2203pdf ↗
1-1/2 inch± pavement milling, asphalt concretesquare yard2—$8.00$8.00May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.