| Maintaining Traffic | ls | 6 | — | $5,000 | $1,500 – $65,800 | Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗ |
| Removed, As Per Plan | ls | 6 | $17,550 | $25,000 | $3,500 – $32,500 | Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 5 | $3.50 | $6.00 | $2.50 – $6.00 | Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 4 | — | $40.00 | $18.00 – $48.00 | Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 4 | — | $35.00 | $16.00 – $45.00 | Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 4 | — | $30.00 | $15.00 – $40.00 | Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 4 | — | $60.00 | $60.00 – $150.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Walk Removed | square foot | 4 | — | $5.00 | $2.00 – $5.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| 12 inch conduit, type b | linear foot | 3 | — | $100.00 | $75.00 – $120.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| 4 inch concrete walk | square foot | 3 | — | $13.00 | $6.75 – $15.00 | Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 3 | — | $1,000 | $1,000 – $5,000 | Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗ |
| Stop Line | linear foot | 3 | — | $9.00 | $9.00 – $10.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Valve Box Adjusted To Grade | each | 3 | — | $300.00 | $225.00 – $400.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Curb And Gutter Removed | linear foot | 3 | — | $10.00 | $8.00 – $10.00 | Jun 25, 2024, Open bid tab, bidtabmadwje2203pdf ↗ |
| Aggregate Base | cubic yard | 3 | — | $65.00 | $65.00 – $112.00 | Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗ |
| Asphalt Concrete Intermediate Course, 12.5Mm, Type A (449) | cubic yard | 2 | — | $300.00 | $261.81 – $300.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Catch Basin, S125A | each | 2 | — | $3,200 | $3,200 – $8,500 | Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗ |
| 15 inch conduit, type b | linear foot | 2 | — | $120.00 | $100.00 – $120.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| 18 inch conduit, type b | linear foot | 2 | — | $140.00 | $100.00 – $140.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| 4 inch shallow pipe underdrains (perforated) | linear foot | 2 | — | $25.00 | $18.00 – $25.00 | Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗ |
| Pavement Repair, As Per Plan | square yard | 2 | — | $100.00 | $100.00 – $180.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Service Box Adjusted To Grade | each | 2 | — | $300.00 | $300.00 – $360.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Sign, Flat Sheet | square foot | 2 | — | $40.00 | $19.00 – $40.00 | Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 2 | — | $25.00 | $25.00 – $30.00 | Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 2 | — | $20.00 | $20.00 – $25.00 | Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 2 | — | $15.00 | $15.00 – $20.00 | Jun 25, 2025, Open bid tab, bidtabmadwje2405pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 2 | — | $1,500 | $1,500 – $5,000 | Oct 29, 2024, Open bid tab, bidtabmadwje2401pdf ↗ |
| Valve Box Removed | each | 2 | — | $100.00 | $10.00 – $100.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Curb Removed | linear foot | 2 | — | $10.00 | $10.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| 6 inch non-reinforced concrete pavement | square yard | 2 | — | $100.00 | $85.84 – $100.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 2 | — | $220.00 | $200.00 – $220.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Channelizing line, 8 inch | linear foot | 2 | — | $2.80 | $2.10 – $2.80 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Crosswalk Line | linear foot | 2 | — | $4.30 | $4.30 – $5.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Ground Mounted Support, No. 3 Post | linear foot | 2 | — | $38.00 | $25.00 – $38.00 | Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗ |
| Manhole Adjusted To Grade | each | 2 | — | $1,000 | $1,000 – $1,200 | Jun 25, 2024, Open bid tab, bidtabmadwje2203pdf ↗ |
| Combination Curb And Gutter, Type 2, As Per Plan | linear foot | 2 | — | $41.50 | $24.00 – $41.50 | Feb 7, 2023, Open bid tab, bidtabmadwje2202pdf ↗ |
| Curb Ramp, As Per Plan | square foot | 2 | — | $40.00 | $11.00 – $40.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Non-Tracking Tack Coat, 0.06 Gal/S.Y. | gallon | 2 | — | $3.00 | $3.00 – $5.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 2 | — | $50.00 | $50.00 – $85.00 | Jun 25, 2024, Open bid tab, bidtabmadwje2203pdf ↗ |
| 1-1/2 inch± pavement milling, asphalt concrete | square yard | 2 | — | $8.00 | $8.00 | May 28, 2025, Open bid tab, bidtabmadwje2204pdf ↗ |