| Seeding And Mulching, Class 1, As Per Plan | square yard | 3 | — | $4.00 | $1.34 – $4.00 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Maintaining Traffic | ls | 3 | — | $2,500 | $1,905 – $2,500 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Removed, As Per Plan | ls | 3 | — | $2,500 | $2,500 – $6,888 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| 8 inch conduit, type c, 707.45, as per plan | linear foot | 2 | — | $75.00 | $75.00 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| 6 inch conduit, type c, 707.45, as per plan | linear foot | 2 | — | $45.00 | $45.00 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| 4 inch conduit, type c, 707.45, as per plan | linear foot | 2 | — | $35.00 | $35.00 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Mobilization | ls | 2 | — | $7,500 | $7,500 – $8,000 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Village Park/Center Street Pump Station #2 Gorman-Rupp Above Ground Package Station | ls | 1 | — | $166,500 | $166,500 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Village Park/Center Street Pump Station #2 Flow Meter | ls | 1 | — | $35,000 | $35,000 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Village Park/Center Street Pump Station #2 Bypass Pumping | ls | 1 | — | $16,500 | $16,500 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Village Park/Center Street Pump Station #2 Forcemain Bypass Connection | ls | 1 | — | $17,500 | $17,500 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Village Park/Center Street Pump Station #2 Wet Well Protective Lining | ls | 1 | — | $36,000 | $36,000 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Village park/center street pump station #2 remove | ls | 1 | — | $7,000 | $7,000 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Schoolhouse Street Pump Station #1 Gorman-Rupp Above Ground Package Station | ls | 1 | — | $152,000 | $152,000 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Schoolhouse Street Pump Station #1 Bypass Pumping | ls | 1 | — | $16,000 | $16,000 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Schoolhouse Street Pump Station #1 Forcemain Bypass Connection | ls | 1 | — | $15,000 | $15,000 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Schoolhouse Street Pump Station #1 Wet Well Protective Lining | ls | 1 | — | $30,000 | $30,000 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Schoolhouse street pump station #1 remove | ls | 1 | — | $6,000 | $6,000 | Sep 12, 2024, Open bid tab, bidtabwooway2301pdf ↗ |
| Water works, misc.: 4 inch water main reconnected, as per plan | each | 1 | — | $500.00 | $500.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 24 inch conduit, reinforced concrete pipe class iii storm sewer | linear foot | 1 | — | $82.00 | $82.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 24 inch conduit, cpslp storm sewer | linear foot | 1 | — | $73.00 | $73.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 18 inch conduit, cpslp storm sewer | linear foot | 1 | — | $54.00 | $54.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 15 inch conduit, cpslp storm sewer | linear foot | 1 | — | $50.00 | $50.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 12 inch conduit, cpslp storm sewer | linear foot | 1 | — | $48.00 | $48.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Water works, misc.: 4 inch water main relocated, as per plan | linear foot | 1 | — | $45.00 | $45.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Type B Rock Channel Protection | cubic yard | 1 | — | $66.00 | $66.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Type 2-3 Catch Basin | each | 1 | — | $2,962 | $2,962 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Embankment, As Per Plan | cubic yard | 1 | — | $8.00 | $8.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 2-1/2 inch asphalt concrete intermediate course, type 2, (448) | cubic yard | 1 | — | $718.00 | $718.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 1-1/2 inch asphalt concrete surface course, type 1, pg 64-22 | cubic yard | 1 | — | $720.00 | $720.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Sanitary Lateral Repair, As Per Plan | linear foot | 1 | — | $12.00 | $12.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Concrete Masonry | cubic yard | 1 | — | $1,400 | $1,400 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Excavation, As Per Plan | cubic yard | 1 | — | $7.70 | $7.70 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $15.00 | $15.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $10.00 | $10.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $8.00 | $8.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Erosion Control | each | 1 | — | $1.00 | $1.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Type 2-2B Catch Basin | each | 1 | — | $2,335 | $2,335 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Tack Coat, 0.06 Gal/S.Y. | gallon | 1 | — | $4.00 | $4.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |
| Subgrade Compaction | square yard | 1 | — | $4.00 | $4.00 | Apr 12, 2022, Open bid tab, bidtabwooway2001pdf ↗ |