| Maintaining Traffic | ls | 4 | — | $816.86 | $816.86 – $18,000 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Mobilization | ls | 4 | — | $8,274 | $8,274 – $25,000 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Contingency/Discretionary Allowance | ls | 3 | — | $54,365 | $27,000 – $54,365 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Pavement milling, asphalt concrete | square yard | 3 | — | $3.40 | $3.25 – $6.50 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Non-Tracking Tack Coat | gallon | 3 | — | $4.90 | $4.50 – $4.90 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Stop Line | linear foot | 3 | — | $8.60 | $8.60 – $24.50 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Curb And Gutter Removed | linear foot | 3 | — | $11.25 | $11.00 – $12.00 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Embankment | cubic yard | 3 | — | $23.25 | $14.00 – $48.00 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Erosion Protection | ls | 2 | — | $810.00 | $675.00 – $810.00 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Inlet Reconstructed To Grade | each | 2 | — | $1,225 | $1,100 – $1,225 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Special - pavement reinforced fabric | square yard | 2 | — | $3.50 | $3.50 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Brick pavement repair incl. remove, subgrade, & replace, as per plan | square yard | 2 | — | $420.00 | $41.00 – $420.00 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Asphalt Concrete Intermediate Course, Type 1, (448) | cubic yard | 2 | — | $185.00 | $175.00 – $185.00 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Seeding And Mulching | ls | 2 | — | $1,250 | $1,250 – $3,100 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Proof Rolling | hour | 2 | — | $201.44 | $90.00 – $201.44 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Combination Curb And Gutter, Type 3, As Per Plan | linear foot | 2 | — | $24.00 | $23.00 – $24.00 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Asphalt Concrete Surface Course, Type 1, (448), Pg64-22 | cubic yard | 2 | — | $205.00 | $180.00 – $205.00 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Construction Layout Stakes And Surveying | ls | 2 | — | $3,189 | $3,189 – $4,000 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Erosion Control | each | 2 | — | $1.00 | $1.00 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Curb Ramp | square foot | 2 | — | $32.88 | $17.00 – $32.88 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Subgrade Compaction | square yard | 2 | — | $2.50 | $2.50 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Crosswalk Line | linear foot | 2 | — | $6.50 | $6.50 – $12.50 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Center Line | mile | 2 | — | $11,280 | $7,200 – $11,280 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Combination Curb And Gutter, Type 2, As Per Plan | linear foot | 2 | — | $24.00 | $23.00 – $24.00 | Jun 29, 2021, Open bid tab, 21000704 ↗ |
| Walk Removed | square foot | 2 | — | $4.50 | $4.50 – $5.00 | Feb 25, 2021, Open bid tab, 20000710 ↗ |
| Aggregate Base | cubic yard | 2 | — | $51.42 | $51.42 – $62.00 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Topsoil furnish and placed | cubic yard | 2 | — | $59.30 | $59.30 – $74.00 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Water | thousand gallons | 2 | — | $145.00 | $1.05 – $145.00 | Feb 25, 2021, Open bid tab, 20000710 ↗ |
| Excavation | cubic yard | 2 | — | $123.72 | $27.00 – $123.72 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| Clearing and Grubbing | ls | 2 | — | $7,077 | $3,500 – $7,077 | Jul 8, 2021, Open bid tab, 20000718 ↗ |
| 8 Inch Non-Reinforced Concrete Pavement, Class Qc1 | square yard | 1 | — | $100.00 | $100.00 | Apr 30, 2020, Open bid tab, 20000704 ↗ |
| Full deep rigid pavement remove and flexible replace | square yard | 1 | — | $93.00 | $93.00 | Apr 30, 2020, Open bid tab, 20000704 ↗ |
| Field Office, Type A | mnth | 1 | — | $2,400 | $2,400 | Feb 25, 2021, Open bid tab, 20000710 ↗ |
| Work Zone Channelizing Line, Class Iii, 642 Paint | linear foot | 1 | — | $0.55 | $0.55 | Feb 25, 2021, Open bid tab, 20000710 ↗ |
| Work zone edge line, class iii, 4 inch, 642 paint | mile | 1 | — | $685.00 | $685.00 | Feb 25, 2021, Open bid tab, 20000710 ↗ |
| Barrier Reflector, Type 1, 1 Way | each | 1 | — | $12.00 | $12.00 | Feb 25, 2021, Open bid tab, 20000710 ↗ |
| Work Zone Impact Attenuator (Unidirectional) | each | 1 | — | $2,000 | $2,000 | Feb 25, 2021, Open bid tab, 20000710 ↗ |
| Drainage Structure Misc.: 18 Inch Diameter Drain Basin With Solid Lid | each | 1 | — | $1,300 | $1,300 | Feb 25, 2021, Open bid tab, 20000710 ↗ |
| Drainage Structure Misc.: City Of Columbus Catch Basin, 12 Inch Diameter | each | 1 | — | $1,400 | $1,400 | Feb 25, 2021, Open bid tab, 20000710 ↗ |
| Drainage Structure Misc.: City Of Columbus Curb And Gutter Inlet, Aa-S125B | each | 1 | — | $2,300 | $2,300 | Feb 25, 2021, Open bid tab, 20000710 ↗ |