| Clearing And Grubbing, As Per Plan | ls | 7 | $5,000 | $1,876 | $1,800 – $10,000 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| Maintaining Traffic | ls | 7 | $7,000 | $6,678 | $2,400 – $15,000 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| Removed, As Per Plan | ls | 7 | $5,000 | $11,326 | $2,500 – $15,000 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| Asphalt Concrete Surface Course, Type 1, (449), Pg64-22 | cubic yard | 6 | $402.00 | $550.22 | $257.50 – $612.11 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (449) | cubic yard | 5 | $353.93 | $353.93 | $290.00 – $500.00 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| Non-Tracking Tack Coat | gallon | 5 | $5.25 | $5.25 | $3.05 – $13.35 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| Erosion Control | each | 5 | $1.00 | $1.00 | $1.00 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 4 | — | $5.00 | $2.50 – $6.00 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 4 | — | $2,615 | $2,615 – $9,680 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| Valve Box Removed | each | 4 | — | $300.00 | $75.00 – $300.00 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 4 | — | $100.89 | $35.60 – $100.89 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| 8 inch conduit, type e, 707.45, storm repair | linear foot | 3 | — | $13.90 | $12.00 – $40.00 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| 6 inch conduit, type e, 707.45, storm repair | linear foot | 3 | — | $7.65 | $7.65 – $50.00 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| Excavation, As Per Plan | cubic yard | 3 | — | $10.85 | $10.85 – $40.00 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| 4 inch concrete walk | square foot | 3 | — | $10.65 | $7.00 – $10.65 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 3 | — | $8,300 | $4,950 – $8,300 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $19.00 | $19.00 – $27.00 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $9.00 | $9.00 – $19.00 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $5.25 | $5.25 – $15.00 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 3 | — | $795.43 | $250.00 – $890.33 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| Subgrade Compaction, As Per Plan | square yard | 3 | — | $2.00 | $0.7 – $2.00 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| Walk Removed | square foot | 3 | — | $4.30 | $1.50 – $4.30 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| Aggregate Base | cubic yard | 3 | — | $49.50 | $35.00 – $49.50 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| Embankment | cubic yard | 3 | — | $1.40 | $1.40 – $42.00 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| 8 inch conduit, type c, as per plan | linear foot | 2 | — | $79.60 | $45.00 – $79.60 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| Remove And Reset Mailbox, As Per Plan | each | 2 | — | $265.87 | $132.00 – $265.87 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| 6 inch sanitary sewer lateral, as per plan | linear foot | 2 | — | $64.52 | $35.58 – $64.52 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| 4 inch sanitary sewer lateral, as per plan | linear foot | 2 | — | $72.95 | $29.79 – $72.95 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| Sanitary Sewer Clean Out, As Per Plan | each | 2 | — | $440.17 | $428.54 – $440.17 | Jan 9, 2025, Open bid tab, bidtaballspe2201pdf-s0 ↗ |
| 12 inch gate valve, as per plan | each | 2 | — | $5,070 | $2,700 – $5,070 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| 4 inch gate valve, as per plan | each | 2 | — | $1,600 | $875.00 – $1,600 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| 1 inch preformed expansion joint filler | square foot | 2 | — | $13.00 | $7.00 – $13.00 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| 6 inch conduit, type b, 707.45 | linear foot | 2 | — | $40.00 | $18.00 – $40.00 | Apr 14, 2023, Open bid tab, bidtaballspe2203pdf ↗ |
| Rock Channel Protection, Type C With Geotextile Fabric | cubic yard | 2 | — | $72.00 | $72.00 – $86.70 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| 6 inch water main, as per plan (pvc c900, dr-18) | linear foot | 2 | — | $207.00 | $78.50 – $207.00 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| Seeding And Mulching, Class I, As Per Plan | square yard | 2 | — | $2.55 | $1.75 – $2.55 | Jul 20, 2023, Open bid tab, bidtaballspe2202pdf ↗ |
| 8 inch gate valve, as per plan | each | 2 | — | $2,500 | $1,500 – $2,500 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| Pipe removed, 24 inch and under (storm) | linear foot | 2 | — | $21.25 | $10.50 – $21.25 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| Remove of ground mounted post support and disposal | each | 2 | — | $65.00 | $50.00 – $65.00 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |
| Remove of ground mounted sign and disposal | each | 2 | — | $65.00 | $50.00 – $65.00 | Jun 27, 2024, Open bid tab, bidtaballspe2302pdf ↗ |