| Water | thousand gallons | 2 | — | $0.01 | $0.01 – $130.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Erosion Control Mat, Type E | square yard | 1 | — | $20.50 | $20.50 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Compaction aggregate, as per plan, type a | cubic yard | 1 | — | $110.00 | $110.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Portable Changeable Message Sign | snmt | 1 | — | $0.01 | $0.01 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Structure Drainage, Misc.: Pipe Extension | ls | 1 | — | $4,300 | $4,300 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Class Qc2 Concrete, Misc.: Grade Beam | cubic yard | 1 | — | $762.00 | $762.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Special - pipe cleanout, 24 inch and under | linear foot | 1 | — | $72.50 | $72.50 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Drilled Shafts, 24 Inch Diameter, Above Bedrock, As Per Plan | linear foot | 1 | — | $223.00 | $223.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Precast Reinforced Concrete Outlet | each | 1 | — | $355.00 | $355.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Field Office, Type B | mnth | 1 | — | $50.00 | $50.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| 6 Inch Base Pipe Underdrains | linear foot | 1 | — | $34.50 | $34.50 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Rail (twin steel tube) | linear foot | 1 | — | $245.00 | $245.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Full deep pavement sawing | linear foot | 1 | — | $12.00 | $12.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Commercial Fertilizer | ton | 1 | — | $717.00 | $717.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Bridge Terminal Assembly, Type 1 | each | 1 | — | $2,400 | $2,400 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Anchor Assembly, Type A | each | 1 | — | $1,600 | $1,600 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Guardrail, Type 5 | linear foot | 1 | — | $38.50 | $38.50 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Asphalt Concrete For Maintaining Traffic | cubic yard | 1 | — | $0.01 | $0.01 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Drilled Shafts, 30 Inch Diameter, Above Bedrock, As Per Plan | linear foot | 1 | — | $210.00 | $210.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Proof Rolling | hour | 1 | — | $430.00 | $430.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Pavement Removed | square yard | 1 | — | $27.50 | $27.50 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Soil Analysis Test | each | 1 | — | $143.00 | $143.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Asphalt Concrete Surface Course, Type 1, (448), Pg64-22 | cubic yard | 1 | — | $90.00 | $90.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Seal of concrete surfaces (epoxy-urethane) | square yard | 1 | — | $71.00 | $71.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $3,900 | $3,900 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| 6 inch conduit, type b | linear foot | 1 | — | $18.50 | $18.50 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Detour Signing | ls | 1 | — | $0.01 | $0.01 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Non-Tracking Tack Coat | gallon | 1 | — | $5.50 | $5.50 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Erosion Control | each | 1 | — | $1.00 | $1.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Seeding And Mulching, As Per Plan | square yard | 1 | — | $13.00 | $13.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (448) | cubic yard | 1 | — | $716.00 | $716.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 1 | — | $382.00 | $382.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Subgrade Compaction | square yard | 1 | — | $8.50 | $8.50 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Center Line | mile | 1 | — | $0.01 | $0.01 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Maintaining Traffic | ls | 1 | — | $3,100 | $3,100 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Manhole Adjusted To Grade | each | 1 | — | $547.00 | $547.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Stabilized Crushed Aggregate | cubic yard | 1 | — | $487.00 | $487.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Aggregate Base | cubic yard | 1 | — | $136.00 | $136.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Embankment | cubic yard | 1 | — | $22.50 | $22.50 | Jun 23, 2021, Open bid tab, 190816 ↗ |
| Topsoil furnish and placed | cubic yard | 1 | — | $256.00 | $256.00 | Jun 23, 2021, Open bid tab, 190816 ↗ |