| Maintaining Traffic | ls | 12 | — | $9,000 | $250.00 – $9,000 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Non-Tracking Tack Coat, 0.10 Gal/S.Y. | gallon | 9 | $5.00 | $5.00 | $4.00 – $5.50 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s0 ↗ |
| Asphalt Concrete, Leveling Course, Type 1, (448) Pg 64-22 | cubic yard | 8 | $153.00 | $164.00 | $146.00 – $164.00 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s0 ↗ |
| 1-1/2 inch asphalt concrete surface course, type 1, (448) pg 64-22 | cubic yard | 8 | $153.00 | $164.00 | $146.00 – $164.00 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s0 ↗ |
| Valve Box Adjusted To Grade | each | 8 | $100.00 | $100.00 | $100.00 – $250.00 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s0 ↗ |
| Manhole Adjusted To Grade | each | 6 | $400.00 | $500.00 | $300.00 – $500.00 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s0 ↗ |
| 1-1/4 inch pavement milling, asphalt concrete | square yard | 5 | $3.00 | $3.00 | $3.00 – $3.25 | Mar 2, 2021, Open bid tab, bidtabsherus2101pdf-s0 ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 3 | — | $5.00 | $1.00 – $5.00 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Removed, As Per Plan | ls | 3 | — | $31,452 | $3,000 – $31,452 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Monument Box Adjust To Grade | each | 2 | — | $500.00 | $500.00 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s1 ↗ |
| 8 inch pvc sdr-35 sanitary sewer, as per plan | linear foot | 2 | — | $50.00 | $50.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 2 | — | $2,750 | $2,500 – $2,750 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Erosion Control | each | 2 | — | $1.00 | $1.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 2 | — | $3,000 | $3,000 – $5,000 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (448) | cubic yard | 2 | — | $181.00 | $181.00 – $400.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| Center Line | mile | 2 | — | $5,000 | $5,000 – $30,000 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s0 ↗ |
| Non-Tracking Tack Coat, 0.06 Gal/S.Y. | gallon | 2 | — | $15.00 | $7.00 – $15.00 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 2 | — | $65.00 | $35.00 – $65.00 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Subgrade Compaction, As Per Plan | square yard | 2 | — | $5.00 | $1.00 – $5.00 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Electric Service | ls | 1 | — | $61,000 | $61,000 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Wet Well Protective Lining | ls | 1 | — | $49,548 | $49,548 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Pump Station Rehabilitation | ls | 1 | — | $275,722 | $275,722 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Temporary Forcemain Bypass Connection | ls | 1 | — | $26,035 | $26,035 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Pump station remove | ls | 1 | — | $14,145 | $14,145 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Aggregate, #57 Stone | cubic yard | 1 | — | $100.00 | $100.00 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| 15 inch conduit, type c. 707.45, storm repair | linear foot | 1 | — | $70.00 | $70.00 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Non-Reinforced Concrete Pavement, Class Qc-1P | cubic yard | 1 | — | $740.00 | $740.00 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Oakwood street 254 1-1/4 inch pavement milling, asphalt concrete | square yard | 1 | — | $3.00 | $3.00 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s2 ↗ |
| Westwood drive 254 1-1/4 inch pavement milling, asphalt concrete | square yard | 1 | — | $3.00 | $3.00 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s1 ↗ |
| School street 254 1-1/4 inch pavement milling, asphalt concrete | square yard | 1 | — | $3.00 | $3.00 | Mar 2, 2022, Open bid tab, bidtabsherus2202pdf-s0 ↗ |
| Temporary 6-Inch Fire Hydrant Assembly, As Per Plan | each | 1 | — | $3,550 | $3,550 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| 14 inch water main, horizontally directionally drilled, as per plan | linear foot | 1 | — | $200.00 | $200.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| 12 inch pvc c909 water main, as per plan | linear foot | 1 | — | $85.00 | $85.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| 36 inch reinforced concrete pipe class-iii storm sewer, as per plan | linear foot | 1 | — | $128.00 | $128.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| Paved Gutter, Misc.: 7' Paved Concrete Gutter, As Per Plan | linear foot | 1 | — | $100.00 | $100.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| 36 inch cpslp storm sewer, as per plan | linear foot | 1 | — | $95.00 | $95.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| 6 inch pvc c-909 water main, as per plan | linear foot | 1 | — | $50.00 | $50.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| Geogrid For Subgrade Stabilization | square yard | 1 | — | $3.00 | $3.00 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |
| Asphalt Concrete Base | cubic yard | 1 | — | $450.00 | $450.00 | Apr 23, 2025, Open bid tab, bidtabsherus2303pdf ↗ |
| Type 2-3 Catch Basin, As Per Plan | each | 1 | — | $1,750 | $1,750 | Sep 8, 2021, Open bid tab, bidtabsherus2005pdf ↗ |